Item No. __10a_supp _____ Date of Meeting: November 23, 2026 Adoption of 2027 Budget 11/23/2026 Outline • 2027 Operating Budget Highlights • Commission Budget Priorities • Community Programs • 2027-2031 Capital Plan • 2027 Sources and Uses of Funds • 2027 Proposed Tax Levy • Remaining 2027 Budget Schedule 2 2027 Operating Budget Highlights ($ in thousands) 2027 Proposed Budget Inc/(Dec) from Inc/(Dec) from 2026 Revised 2026 Revised Budget($) Budget(%) 2024 Actual 2025 Actual 2026 Revised 2026 Budget Budget 1,021,838 1,122,446 1,158,895 1,135,885 1,225,404 89,520 7.9% 28,945 11,611 1,002 24,791 27,343 2,552 10.3% 1,050,783 1,134,057 1,159,897 1,160,676 1,252,747 92,072 7.9% O&M Expenses w/o Pension Credit DRS Pension Credit 675,431 (22,790) 698,282 (25,970) 731,141 - 758,484 - 786,717 - 28,234 - 3.7% 0.0% O&M Expenses with Pension Credit 652,642 672,311 731,141 758,484 786,717 28,234 3.7% 6,731 4,698 35,864 8,521 8,795 274 3.2% Total Operating Expenses GASB Comparable Basis 659,373 677,009 767,005 767,004 795,512 28,507 3.7% Net Operating Income (with Pension Credit) 369,196 450,135 427,754 377,401 438,687 61,286 16.2% Operating Revenues GASB 87_96_103 Revenues Total Operating Revenues GASB Comparable Basis GASB 87_96_103 Expenses • Operating revenues up 7.9% to $1,225 million from 2026 revised budget • Operating expenses up 3.7% to $787 million from 2026 revised budget • Net Operating Income up 16.2% to $439 million from 2026 revised budget 3 Commission 2027 Budget Priorities (Aviation) • $200K Childcare Bridge Strategy to support SEA childcare policy implementation efforts in partnership with External Relations and Office of Equity, Diversity, and Inclusion. • $500K Airport Dining & Retail Cost of Doing Business Study to assess tenant competitiveness, passenger behavior, and the full cost of doing business at SEA, with the first report to the Aviation Committee by end of Q2 2027. • Continue to make progress on preconditioned air equipment maintenance, replacement, and usage. 4 Commission 2027 Budget Priorities (Maritime) $100K Maritime Industrial Base- To analyze workforce, industry capacity, regulatory needs, and competitiveness to position Washington as a shipbuilding-ready center. In EDD Budget. $50K Sea Lion Mitigation - Seeking new & innovative ways to address this difficult challenge. (Could be closer to $80K) $50K Cruise Alternative Fuel Tariff Assessment- Exploring an alternative fuel tariff could help accelerate low-carbon fuel adoption by offsetting cost barriers for cruise operators, and the Port will conduct legal and economic analysis to understand its feasibility and potential impacts. In Legal Budget. 5 Commission 2027 Budget Priorities (EDD) • Maritime Industrial Base Shipbuilding Readiness - $90k total - $40k for maritime workforce supply/demand analysis (included in baseline WFD budget) - $50k for State Maritime Action Plan (included in baseline EDD operations budget) • Advancing Sustainable Fuels - $50k (included in baseline EDD operations budget) • Green Economy - $100k (included in baseline EDD operations budget) • Phase II: Small Business Contract Readiness - $50K (included in D&C baseline budget) • Core Plus Maritime Funding - $50k (included in WFD baseline budget) • Strengthening ESOL Pathways to Workforce Development - $200k (included in baseline budget with OEDI/WFD) 6 Commission 2027 Budget Priorities (Central Services) $627K Duwamish Valley Community Equity Program - To support green jobs, and programs that promote community-port collaboration. $134K for Language Access Program - To increase language access for speakers with limited English proficiency. $88K for Anti-Human Trafficking - support the Port's anti-human trafficking campaign efforts. $37K Port U: Port 101 Adult Education Series - To increase awareness of Port programs, initiatives, and facilities. 7 Port Community Programs Duwamish Valley job fair SKPC EIP Meeting * * Detailed list included in the Appendix. 8 2027 Port Community Program Funding by Activity Economic Development • Diversity in Contracting -$2.2M (excludes the $250K for SKPC) • Tourism Marketing Support - $2.1M • EDD Partnership Grants - $950K • Maritime Blue - $100K * 2027 Proposed Budget: $19.6M Workforce Development • Workforce Development Department - $5.0M • High School Interns - $550K Equity, Diversity & Inclusion • OEDI Department - $4.4M (includes $1.9M for SKPC) • South King and Port Communities Fund - $750K without the $1.9M from EDI (shown above). Total for the whole program $2.6M • Friends of the Waterfront- $750K • Staff Costs supporting DVCEP & SKCCIF - $776K • Duwamish Community Equity program (DVCEP) - $627K SeaTac ILA • $1.4M * Detailed list included in the Appendix. 9 2027-2031 CIP Summary 2027 Budget Committed Capital Projects Aviation Division Maritime Division Central Services Other Total Committed Business Plan Prospective Projects CIP Cashflow Adjustment Reserve Total CIP 896,343 185,633 13,598 647 1,096,221 101,617 (180,902) 1,016,936 2027-2031 CIP 3,177,858 418,731 33,272 27,535 3,657,396 1,223,241 0 4,880,638 % of 2027 Total Committed 81.8% 16.9% 1.2% 0.1% 100.0% Notes: 1) Definitions and details of the capital budget can be found in Section IX. 2) Includes the Stormwater Utility and NWSA Joint Venture 10 2027 Sources of Funds Operating Revenues without NWSA 45.9% Proceeds from Bond Issues 34.4% Passenger Facility Charges 3.9% Tax Levy 3.8% Interest Receipts 3.1% NWSA Distributable Cash 3.0% Grants and Capital Contributions 2.2% Rental Car Customer Facility Charges 2.0% Other Receipts 1.5% • 45.9% of funding sources comes from operating revenues w/o NWSA • 34.4% of funding sources comes from bond proceeds Total Sources: $2,546 million • The tax levy makes up 3.8% of total funding sources in 2027 11 2027 Uses of Funds Capital Expenditures 41.5% Total Operating Expenses • Plan to spend about 41.5% of total funds on capital projects in 2027 • 32.1% of total expenditures on operating expenses 32.1% Interest Payments 11.4% Bond Redemptions 10.7% Payment to NWSA for Capital Expenditures 3.1% Public Expense 0.9% Other Expenses 0.4% Total Uses: $2,451 million 12 2027 Tax Levy Tax Levy Summary • Levy amount is approved annually by the Commission • Levy can be leveraged by issuing General Obligation (G.O.) bonds • Current Levy uses: - G.O. bond debt service - Environmental remediation and sustainability - Regional transportation mobility - Community: equity, workforce, economic development - Investments in seaport infrastructure • The Port may approve a levy amount up to the maximum allowable within statutory limits ($122.0 million in 2026) • 2027 levy proposed to be $97.6 million 14 2027 Est. 2026 2025 2024 2023 2022 2021 2020 2019 2018 2017 $50 2016 2015 2014 2013 $75 2012 2011 2010 2009 2008 2007 2006 2005 2004 2003 $100 2002 2001 2000 1999 1998 1997 1996 1995 1994 1993 1992 1991 1990 Levy History $ Millions $125 Maximum Allowable Levy Actual Levy Levy Tied to Inflation (beginning 1990) $25 $0 15 From 75/75 to 80/70: more cash, not more debt 2027, at the ~ $122.0M m axim um C urrent 75/75 Pro p o sed 80/70 C hang e 75% 80% + 5 p ts Levy am o unt $91.5M $97.6M + $6.1M H ead ro o m b elo w m axim um $30.5M $24.4M G .O . d eb t service cap (75% vs. 70% ) $68.6M $68.3M −$6.1M Levy cash after m axim um G .O . d eb t service $22.9M $29.3M Levy as % of m axim um −$0.3M + $6.4M Debt capacity stays flat. The proportion of our capital funded with cash increases, mitigating growth in interest costs. interest costs. 16 Taxpayer Impact 2026 2027 preliminary Tax Levy ($ million) 90.2 97.6 Estimated millage rate ($/1000) 0.0980 0.1112 Median home value ($) (1)(2) 887,000 850,000 $87 $95 Estimated median home Port tax ($) (1) (2) 2026 per King County; 2027 data is not yet available 2025 median assessed value was $844,000 • The Port's levy was approximately 1.1% of total property taxes levied in King County in 2026 17 What it means for a typical homeowner 2026 PORT TAX 2027 Proposal (ESTIMATE) $87 ≈$95 median home, levy $90.2M median home, levy $97.59M +$8 a year About 67¢ a month. The levy rises rises 8.2% in 2027, then returns returns to ~2% annual growth growth with the maximum Estimate assumes the median home's assessed value moves with the countywide total. Based on the preliminary assessed value the estimated median home price for 2027 is $850,000. 18 Remaining 2027 Budget Schedule o Adoption of 2027 Budget on Nov. 23, 2026 o File the Statutory Budget with King County by Nov. 30, 2026 o Release the 2027 Final Budget Document on Dec. 4, 2026 19 Appendix 20 2027 Budget Process Recap Jun 23 Commission Budget Study Session (Commission Priorities) Jul 14 Sept 22 Commission Budget Study Session (Commission Priorities) & 2027 Budget Development Briefing 2027 Central Services Operating and Capital Budgets Briefing and Port Wide Rollup Oct 13 2027 Aviation Division Operating Budget Briefing Oct 13 2026 Maritime and EDD Operating and Capital Budgets Briefing Oct 20 Preliminary 2027 Budget Document provided to the Commission Oct 22 Preliminary 2027 Budget Document released to the public Oct 27 Tax Levy & Draft Plan of Finance Commission Briefing Nov 17 Introduction & Public Hearing of the Preliminary 2026 Budget Nov 23 Adoption of the 2026 Budget Nov 30 File the 2026 Statutory Budget with King County Dec 4 Release the 2026 Final Budget and Draft Plan of Finance 21 2026-7 Business Activity Forecasts Aviation Division: • Passenger volumes for 2027 projected to be 53.8M, 1.3% higher than 2026 forecast • Funding operating needs and capital program: o Manage growth of costs o Deliver consistent growth through innovation in non-aeronautical revenues Maritime Division: • Cruise forecasts 329 vessel sailings with over 2.0 million • Grain volume budgeted at 3.5 million metric tons, a 9.0% increase from the 2026 budget • Commercial Properties target 90% occupancy rate at the end of 2026 • Conference and Event Center expects a 20.6% revenue increase from the 2026 revised budget, driven by waterfront revitalization Economic Development Division: • Investing in regional economic growth through key initiatives. Expand the talent pipeline to address labor shortages and workforce needs in the maritime, aviation, and construction sectors 22 2027 Proposed Community Programs Program (in $000) 1) South King and Port Communities Fund 1 2) Duwamish Valley Community Equity Program 3) EDD Partnership Grants 4) Tourism Marketing Support Program 5) Airport Spotlight Ad Program* 6) City of SeaTac ILA* 7) Maritime Blue (formerly Maritime Innovation Center) 8) Workforce Development 9) High School Internship Program 2 10) Diversity in Contracting 11) Equity, Diversity & Inclusion 3 12) Friends of the waterfront Sub Total Payroll charged to the Levy Grand Total 4 2027 Proposed Budget 2,648 627 950 2,124 1,400 100 5,018 550 2,438 4,404 750 % of the 2027 2027 Budget Funded Funded by the levy by the levy 2,648 100.0% 627 100.0% 950 100.0% 870 41.0% 0.0% 1,400 100.0% 100 100.0% 3,873 77.2% 299 54.4% 300 12.3% 2,127 48.3% 750 100.0% 2024 Budget 2,214 471 950 1,875 466 1,400 175 5,077 486 2,304 2,065 2025 Budget 2,205 619 950 2,154 518 1,400 175 4,976 520 2,356 2,459 750 2026 Revised Budget 2,195 617 950 2,134 518 1,400 180 4,972 523 2,463 2,540 2,000 18,803 19,591 20,642 18,861 11,796 63% 589 19,392 781 20,372 848 21,491 776 19,637 776 12,572 100.0% 64.0% Notes: 1) SKPC budgeted under Ext Rel, EDI, and DIC 2) $250K Small Business Accelerator under DIC is part of item 1 SKPC 3) $1.9M for Economic Opportunities for Communities (EOC) under EDI is part of item 1 SKPC 4) 2027 Payroll only for CPO & Ext. Rel. Other payroll from HS Interns, WFD, EDI are included in the individual items above * Non-Operating Accounts 23 Community Programs Funded by Tax Levy Program (in $000) 1) South King and Port Communities Fund 1 2) Duwamish Valley Community Equity Program 3) EDD Partnership Grants 4) City of SeaTac ILA* 5) Maritime Blue (formerly Maritime Innovation Center) 6) Workforce Development 7) High School Internship Program 2 8) Diversity in Contracting 9) Equity, Diversity & Inclusion 3 10) Friends of the waterfront 11) Other Total Payroll charged to the Levy 4 Grand Total 2024 Funded by the levy 2025 Funded by the levy 2026 Funded by the levy 2027 Funded by the levy Inc/(Dec) from 2026 Revised Budget $ Change % Change 2,214 471 950 1,400 175 3,863 259 300 203 806 11,772 2,205 619 950 1,400 175 3,762 280 310 226 750 1,608 12,404 2,195 617 950 1,400 180 3,827 290 300 230 2,000 1,438 13,577 2,648 627 950 1,400 100 3,873 299 300 2,127 750 870 11,796 453 10 (80) 46 9 1,897 (1,250) (568) (1,781) 17.1% 1.6% 0.0% 0.0% -80.0% 1.2% 3.0% 0.0% 89.2% -166.7% -65.3% -15.1% 580 12,352 781 13,185 848 14,426 776 12,572 (72) (1,854) -9.3% -14.7% Notes: 1) SKPC budgeted under Ext Rel, EDI, and DIC 2) $250K Small Business Accelerator under DIC is part of item 1 SKPC 3) $1.9M for Economic Opportunities for Communities (EOC) is part of item 1 SKPC 4) 2027 Payroll only for CPO & Ext. Rel. Other payroll from HS Interns, WFD, EDI are included in the individual items above * Non-Operating Accounts 24 2027 Operating Budget for Aviation ($ in thousands) 2024 Actual 2025 Actual 2026 Budget 2026 Revised Budget 2027 Proposed Budget Inc/(Dec) Inc/(Dec) from 2026 from 2026 Revised Revised Budget($) Budget(%) 65,235 10.5% 11,871 3.5% 77,105 8.0% 3,323 33.7% 80,429 8.3% Aeronautical Revenues Airport Non-Aero Revenues Total Operating Revenue GASB 87_96_103 Revenues Total Operating Revenues GASB Comparable Basis 520,942 340,360 861,301 15,287 876,588 545,307 363,215 908,522 (8,407) 900,116 617,786 367,381 985,167 (13,917) 971,250 618,565 343,592 962,157 9,872 972,029 683,800 355,463 1,039,262 13,195 1,052,457 O&M Expenses w/o Pension Credit DRS Pension Credit O&M Expenses with Pension Credit 548,405 (18,577) 529,828 558,138 (21,111) 537,028 588,135 588,135 589,858 589,858 604,041 604,041 14,183 14,183 2.4% 0.0% 2.4% GASB 87_96_103 Expenses Total Operating Expenses GASB Comparable Basis 2,033 531,861 5,167 542,195 9,800 597,935 8,101 597,958 8,265 612,306 165 14,348 2.0% 2.4% Net Operating Income (with Pension Credit) 331,473 371,495 397,032 372,299 435,221 62,922 16.9% 25 2027 Operating Budget for Seaport ($ in thousands) 2024 Actual 2025 Actual 2026 Budget 2026 Revised Budget 2027 Proposed Budget Inc/(Dec) Inc/(Dec) from 2026 from 2026 Revised Revised Budget($) Budget(%) 11,992 10.9% (16) -100.0% (1,029) -1.8% 1,359 22.4% 107 41.4% 12,414 7.1% (771) -5.2% 11,643 6.2% Maritime Economic Development Joint Ventures 1 Stormwater Utility/ELIM Central Services Operating Revenues GASB 87_96_103 Revenues Total Operating Revenues GASB Comparable Basis 92,952 8 61,406 5,635 534 160,537 13,658 174,195 101,085 1 105,850 6,525 463 213,924 20,018 233,941 110,425 16 56,972 6,057 259 173,728 14,919 188,647 110,425 16 56,972 6,057 259 173,728 14,919 188,647 122,417 55,943 7,416 366 186,142 14,148 200,290 Maritime Economic Development Joint Ventures Stormwater Utility/ELIM Central Services O&M Expenses w/o Pension Credit DRS Pension Credit O&M Expenses with Pension Credit 101,991 2,974 2,354 5,953 13,754 127,026 (4,212) 122,814 111,423 2,663 11,516 6,338 8,203 140,143 (4,860) 135,284 115,962 3,390 5,154 5,661 12,839 143,007 143,007 140,628 3,390 5,564 5,688 13,357 168,626 168,626 142,437 4,372 17,711 7,003 11,154 182,676 182,676 1,809 981 12,147 1,315 (2,203) 14,051 14,051 1.3% 28.9% 218.3% 23.1% -16.5% 8.3% 0.0% 8.3% GASB 87_96_103 Expenses Total Operating Expenses GASB Comparable Basis 4,698 127,512 (469) 134,814 26,063 169,070 420 169,046 529 183,205 109 14,159 25.9% 8.4% Net Operating Income (with Pension Credit) 37,723 78,640 30,721 5,102 3,465 (1,636) -32.1% Table Notes: 1) Includes NWSA Distributable Revenue 26 2027 Comprehensive Budget ($ in thousands) (Combined Operating & Non-Operating Items) 2024 Actual 2025 Actual 2026 Budget 2026 Revised Budget 2027 Proposed Budget Inc/(Dec) Inc/(Dec) from 2026 from 2026 Revised Revised Budget($) Budget(%) Explanations Revenues 1. Operating Revenues 2. Tax Levy 3. Passenger Facilities Charges 4. Customer Facilities Charges 5. Fuel Hydrant 6. Non-Capital Grants and Donations 7. Capital Contributions 8. Interest Income 9. Other Noncapital Subsidies 10. Lease Interest Income Total 1,021,838 85,885 99,364 24,896 6,389 3,491 94,282 81,374 25,110 21,711 1,464,341 1,122,446 87,841 98,144 24,821 6,561 3,052 40,308 117,805 2,952 26,964 1,530,894 1,158,895 90,180 102,054 25,327 6,986 2,209 54,699 74,857 2,923 24,791 1,542,920 1,135,885 90,180 102,054 49,634 6,986 2,209 54,699 74,857 2,923 24,791 1,544,217 1,225,404 97,588 100,350 51,947 6,986 3,417 53,390 78,812 2,974 27,343 1,648,211 89,520 7,408 (1,704) 2,313 () 1,208 (1,309) 3,955 51 2,552 103,994 7.9% 8.2% -1.7% 4.7% 0.0% 54.7% -2.4% 5.3% 1.7% 10.3% 6.7% Higher operating revenues from each division A 8.2% increase proposed in 2027 Lower enplanements than 2027 Higher CFC revenue in 2027 Expenses 1. Operating Expenses 2. Depreciation 3. Revenue Bond Interest Expense 4. GO Bond Interest Expense 5. Public Expense 6. Other Non-Op Rev/Expenses 7. Special Item Income/Expense Total 652,642 277,917 150,434 14,365 11,150 41,608 91,107 1,239,222 672,311 298,355 174,153 15,184 4,320 (46,161) 1,118,162 731,141 308,165 210,147 17,309 6,263 34,873 1,307,899 758,484 308,165 210,147 17,309 6,263 8,048 1,308,416 786,717 342,538 222,468 20,848 20,999 7,744 1,401,314 28,234 34,372 12,321 3,539 14,736 (304) 92,898 3.7% 11.2% 5.9% 20.4% 235.3% -3.8% 0.0% 7.1% Higher operating expenses from operating divisions More new assets coming to service New bond issuances and higher interest rates in 2027 Higher Go Bonds Interest Expense in 2027 Higher Public Expenses in 2027 mainly due to WSDOT Gateway Program Higher SBITA and Lease interest expenses offset by Acct Recv Interest 225,118 412,732 235,021 235,800 246,897 11,096 4.7% Revenues over Expenses Higher Non-Capital Federal Grant in 2027 Lower Capital Federal Grant in 2027 Higher interest rates and fund balance in 2027 In line with the 2026 budget Higher GASB 87 lessor lease interest income in 2027 27 2027 FTE Summary Aviation Maritime Econ Dev. Central Services Total 2026 Approved FTE's Mid Year Approval Eliminated Net Transfers Adjusted 2026 FTE's 1 2027 Budget Eliminated Transferred New FTE's Repurposed Total 2027 Changes 1,387.4 1,387.4 324.5 324.5 18.0 5.0 23.0 985.0 1.5 (4.6) (5.0) 976.9 2,714.8 1.5 (4.6) 2,711.8 (45.3) (45.3) (2.0) (2.0) - (39.0) - 2.0 (2.0) (39.0) (86.3) 2.0 (2.0) (86.3) Proposed 2027 FTE's 1,342.1 322.5 23.0 937.9 2,625.5 Notes: 1) Includes FTEs from Stormwater Utility in Maritime Division. 28 Equity in Budgeting Highlights 29 Equity Spending Criteria If an investment meets one of the definitions, then it must also meet at least one of the key criteria: A. Advances diversity for the Port. B. Removes systemic barriers for BIPOC or structurally excluded communities to participate in the Port. C. Programs and funding that were developed through direct engagement with communities, and/or communities been consulted in design of the program. D. Has a demonstrable impact in quality of life for BIPOC or structurally excluded communities. E. Was intentionally designed to have a positive impact in BIPOC or structurally excluded communities . F. Achieves our environmental justice goals and removes barriers for BIPOC or structurally excluded communities to live and enjoy a healthy environment. 30 2027 Port Wide Equity Spending by Category Supplier Diversity 1,590,500 1,562,143 10,868,213 Removing Systemic Barriers Environmental Justice Engagement 9,711,515 1,698,690 '27 Budget 1,186,174 '26 Budget 1,187,675 1,135,925 8,954,235 Community Investments Advancing Diversity 8,566,156 3,039,091 3,032,330 31 Port Wide Equity Spending Funded by Tax Levy 39.6% 39.6% 37.6% 38.2% 28.5% 22.7% 21.0% 2019 29.4% 2020 2021 2022 2023 2024 2025 2026 Bud 32 2027 Equity Spending Highlights • Workforce Development Programs ($3,974K) - Airport Employment Center ($1,145K) - Youth Career Launch Program ($670K) - Taxi Driver Employment Navigator ($375K) - Construction Pre-Apprenticeship Services ($375K) • South King and Port Communities Fund ($2,398K) - Total SKPCF is $2,648K if including $250K in Diversity in Contracting in EDD • Noise Part 150 Study ($1,397K) • Transportation Pilot for SEA workers "SEA Moves" ($1,500K) • EDD Partnership Grants ($950K) 33 2027 Equity Spending Highlights - Con't • Duwamish Valley Community Equity Program ($626K) • ADR Rental Equity Study ($500K) • Veteran's Program ($378K) • High School Internship Program ($299K) • Childcare Bridge Strategy ($200K) • Language Access Fund ($134K) • Clean Fuel Policy Advocacy and Coalition Building ($100K) • Anti-Human Trafficking ($83K) • Equity Assessment Implementation ($50K)* • Equity Index ($50K) • Employee Resource Groups ($32K) 34 Context of the Levy Discussion 2026 Levy Discussion • In the 2026 Tax Levy Discussion, the Commission charged Corporate Finance with examining multiple levy scenarios. March Retreat • Those scenarios were previewed at the March retreat, as well as a new approach for increasing capacity without increasing debt. Proposal • The new approach previewed in March is today's baseline staff proposal. 35 Managing the Levy Using a Balanced Approach GOAL Manage the levy to provide financial financial resilience and to support support the region, today and for for the long term RECOMMENDATION 2027 ACTIONS Move from 75/75 to 80/70 • Levy at 80% of the maximum maximum • Cap G.O. debt service at 70% of 70% of the annual levy Set the 2027 levy at $97.59M 36 Levy Background: A Tool Managed with Discipline 1911 1961 King County voters State expands the create the Port as a Port's taxing public port district authority 2010 2015 2023 2027 Transportation & Infrastructure Fund created for regional commitments Commission sets levy use criteria for for capital (updated (updated 2018) Environmental Legacy Fund created; $62M deposited to date Proposed: 80/70 to fund resilience and revenue Throughout, the levy has funded projects that promote resiliency and community benefit: environmental cleanup, cleanup, community programs, regional transportation (including the SR-99 tunnel) and public waterfront assets. The assets. The Commission has chosen to keep it well below the legal maximum. 37 Our needs are outpacing the current approach Infrastructure upgrades & modernization Aging and at-risk assets Mission opportunities • T- 91 Electrical System M o d ernizatio n • U p d ating Infrastructure fo r Future fuels • Waterfro nt C lean Energ y Strateg y Im p lem entatio n • Enhancing Infrastructure Resiliency • S eism ic up g rad es • Pier 69 renewal • M o o ring d o lp hins • FT N o rth West D o ck • S alm o n Bay Investm ents • Bulkhead rep lacem ents • Habitat acquisition • Real Estate Acquisition • Financial sustainability projects • Needs beyond 2031, when capital plans assume lower spending 38 5-year Tax Levy Fund Sources and Uses ($ million) SOURCES OF TAX LEVY & RELATED FUNDS Beginning Balance - Tax Levy Beginning Balance - ELF Tax Levy Collections Existing GO Bond Proceeds Future GO Bond Proceeds Environmental Grant Receipts Total Sources 2027-2031 $ 38 31 502 78 250 4 $ 903 USES OF TAX LEVY & RELATED FUNDS G.O. Bond Debt Service (existing) G.O. Bond Debt Service (new) Environmental Remediation Liability (Non-Airport) Seaport Capital Investments Sound Insulation Community Programs Total Uses 2027-2031 $ 180 73 263 318 7 63 $ 904 Note: Excludes TIF 39 Two levers set how the levy is used Lever 1 · How much we levy A percentage of the statutory maximum. The gap below the maximum is "dry powder" for future needs. Lever 2 · How much we leverage The share of the levy committed to G.O. bond debt service. The rest is cash for capital and programs. THE RULES • Commission sets the levy each year, up to the legal maximum • The maximum grows about 2% a year (1% limit plus new construction); 2027 max ≈ $122.0M • Usable for any Port purpose except revenue bond debt service • G.O. bond debt service is the first claim on the levy • Commission can further restrict uses by policy 40 The Step Today: 80/70 O p tio n Taxp ayer lens Investo r lens A d d ed cap acity C urrent 75/75 M o d est annual increases; fund s key initiatives Flexib ility fro m m anag ing levy and leverag e Baseline Pro p o sed 80/70 M o d erate increase; value d ep end s o n use Flexib ility m aintained thro ug h levy and leverag e lim its $67M , 2027-2035 Because the levy base grows each year, the added capacity compounds, while the cushion below the maximum stays in place. The Long-Term Commitment Hold the Levy at this level and shape the capital plan to accommodate. 41 A small share of the property tax bill 1.1% $87 $90.2M of the $8.5B in King County property taxes went to the Port in 2026 Port share of a median homeowner's $8,204 total property tax bill (2026) 2026 levy: 75% of the $120.2M maximum; up 2.0% from $88.4M Because assessed value grew faster than the levy in 2026 (~3.5% vs. 2.0%), the millage rate edged down, from $0.1012 to $0.0980 per $1,000. 42 2016-2027 Tax Levy & Millage Rate (1) (1) Millage rate represents the amount per every $1,000 of assessed valuation 43 Sources of Tax Levy & Related Funding: 2027-2031 Total Sources - $904M  2027 levy set at 80% of maximum allowable  Future tax levy collections based on ~2% annual levy growth  $78M of existing GO Bond proceeds from issuances in 2022 and 2024  Forecasts assume $250M of additional GO Bonds issue over the next 5 years to support capital investments and environmental costs Note: Excludes TIF funds 44 Uses of Tax Levy & Related Funding: 2027-2031 Total Uses - $904M  Existing GO Bonds DS includes both Seaport capital investments and SR-99 tunnel contribution  Environmental costs are projected to continue well past 2031, but are fully funded with levy resources including G.O. bonds  Assumes continuation of levy funded Community Programs at ~$13M annually Note: Excludes TIF spending Every Additional Use of the Tax Levy for Operations Has an Opportunity Cost, Reducing Maritime Capital 45 2027 Port Community Program funded by the levy Economic Development • • • • EDD Partnership Grants - $950K Tourism Marketing Support - $870K Maritime Blue - $100K Diversity in Contracting -$50K Workforce Development • Workforce Development Department - $3.9M • High School Interns - $299K Equity, Diversity & Inclusion • OEDI Department - $2.1M (includes $1.9M for SKPC) • South King and Port Communities Fund - $750K without the $1.9M from EDI (shown above). Total for the whole program $2.6M • Staff Costs supporting DVCEP & SKCCIF - $776K • Friends of the Waterfront- $750K • Duwamish Community Equity program (DVCEP) - $627K SeaTac ILA • * 2027 Proposed Budget funded by the levy: $12.6M $1.4M * Detailed list included in the Appendix. 46