Main Terminal Improvement Program
Emergency Power
Presenter and Capital Program Leader Kristofer Casselman
May 26, 2026
Item No. 10b_supp
Meeting Date: May 26, 2026
Project Purpose & Objectives
The Main Terminal Improvement Program Emergency Power (MTIP) will provide
emergency power to the Main Terminal and Concourses B, C, and D. The emergency
power is required by code and drives the smoke control systems of the Main Terminal
and concourses, ultimately improving the safety of the airport.
This Sustainability Framework Tier One project is electrical in nature and due to its
emergency use condition, is driven by National Electric Code requirements.
The project requests to move forward to 30% design at a cost of $7M. At completion
of 30%, the team will be back to ask for the remaining amount.
2
3
Project Scope
The project will provide
two (2) 3MW generators
adjacent to the parking
garages’ southernmost
helix.
Southern edge of the garage, with potential generator routes shown in red dash.
4
Project Scope
The project will deliver power loads from the South Main Service Point (SMS) and another
from the North Main Service Point (NMS).
Existing North and South service point routes show in green.
5
Project Scope
The project will remove
decommissioned generators
and install new distribution
centers.
Generators (yellow).
Generator (green).
6
Schedule Overview
Delivery Method:
Design Build
BRIDING DOCUMENTS (30%)
NTP FOR DESIGN (30 - 100%)
Cone of Certainty
7
We
Are
Here
Action Requested
Commission authorization for $7,000,000 to complete 30% design of this project.
8
Questions?
9