2023 Airfield Projects – Contract 2
Background
The 2023 Airfield Projects - Contract 2 encompassed critical infrastructure projects aimed at enhancing
airfield safety, security, and operational efficiency at Seattle-Tacoma International Airport (Airport).
These projects addressed both immediate and long-term needs for the Airport’s airfield infrastructure.
These projects were designed to work in tandem with other capital projects, minimizing disruption to
airport operations, assuring compliance with regulatory requirements, and improving the airfield’s long-
term functionality.
Key projects within Contract 2 include:
• Snow Storage Expansion: This project increased snow storage capacity by expanding the
existing snow storage areas. The project also improved the infrastructure that supports these
areas, such as widening the perimeter roadway to accommodate snow removal equipment and
improving the airfield operational safety during winter storm events.
• Overheight Vehicle Damage Protection System (OHVDPS): This project installed warning
bars on the perimeter road at a height of 14’ to stop overheight vehicles from striking the FAA
approach lighting bridge that crosses the perimeter road at the north end of runway 16R.
• Cascade Road: This project extended a mid-airfield power ductbank.
• Perimeter Intrusion Detection System (PIDS): This project will enhance airport perimeter
security and public safety by deploying power and communication infrastructure, along with
advanced monitoring technology to track and respond to security threats. It will also provide
infrastructure to undeveloped areas on the airfield and support AV Security business and
operational goals. The PIDS system will integrate with other airfield improvements, boosting both
security and operational efficiency.
• Secured Area Vehicle Checkpoints Project (SAVCP): This project will provide the
infrastructure and equipment needed to support full employee screening at the North and South
boundaries of the airfield’s secured area. It includes the installation of vehicle gates and security
screening equipment to make sure that only authorized vehicles are permitted access to critical
areas, enhancing overall airport security.
Estimated cost by Project: