PC Air Handling Unit Replacement
24 June 2025
Item No. 8d supp
Meeting Date: June 24, 2025
16 Air Handling Units (AHUs) have
burst heating coils. These provide
heating to the aircraft during winter
operations.
Gates with burst coils include: A9, B1,
B3, B6, B7, B8, B10, B11, B12, B14,
B15, D1, D3, D8, S2, S10 (widebody).
Replace and refurbish the 16 AHUs
identified as soon as possible, so
aircraft do not need to run jet-fuel
powered aircraft auxiliary power units
while parked at gates.
Project Request Review
2
Gates Affected
3
Multiple freeze events contributed to
current heating coil failures (not end of
life). The units are still able to provide
cooling.
This project restores heating at 16 gates as
soon as possible. Separate from this
project, work continues to identify
solutions to improve PC Air cooling
system-wide.
A future project is currently being
developed that will consider wholistic
changes to the PC Air system to include
freeze mitigations, programming
adjustments, and a host of infrastructure
and AHU upgrades
.
.
Project Context
4
Commission Authorization
Request authorization for the PC Air Handling Units
Replacement Project be approved.
Estimated Project cost: $4,065,387
5