COMMISSION AGENDA – Action Item No 8h Page 2 of 7
Meeting Date: December 10, 2024
Template revised June 27, 2019 (Diversity in Contracting).
The selected team scored Acceptable, Good, or Outstanding in each of the selection criteria and
provided improvements to the infrastructure scope. The proposal shows an early completion of
approximately one (1) month, and a solution that significantly reduces operational impacts to the
MIC property tenants and fishermen that will utilize the piers during construction.
Additionally, this request authorizes additional funds for the electrical equipment Contract No.
C-00321766 to provide additional budget for temporary storage of the equipment and a scope
change to include code required changes.
Diversity in Contracting
There are multiple elements within the scope of this project that will provide WMBE business
opportunities. The Design Build effort has a goal of 12% WMBE participation rate. The selected
team has committed to exceeding this goal with a total inclusion commitment of 13.78%. This
commitment is split between seven (7) companies.
DETAILS
Scope of Work
The project consists of demolishing existing switchboards, structural concrete pads, and a 1940’s
era steel oil shed; decommissioning conduits and wire; and replacing all with new structural
infrastructure, conduits, wires, switchboards, and associated equipment. The switchboards will
be upsized from existing capacity of between 400 and 600 amps to 2000 amps for the smaller
switchboards and from 2500 Amps to 4000 Amps for the main switchboard for future capacity
needs (e.g., EV chargers, shore power). This project will not increase the electrical load at the site
at this time.
The following electrical equipment will be replaced (owner furnished equipment procured under
Contract No. C-00321766):
1. Switchboard 4SP and 2SPN (service entry to site)
2. Switchboard 4W and 2W (Mooring Pier) installed as make-ready only due to bulkhead
wall conditions
3. Switchboard 4P and 2P (wharf - NE side of Building A-1)
4. Switchboard EY4 (east side of Building A-1)
5. Switchboard SEY4 (lighting connection for east lot)
6. Switchboards EY4 and SEY4 will be consolidated with 4P and 2P in one location that has
better access. Additionally, this will eliminate a stormwater intrusion point at EY4.