FT C15 Building Improvements
Commission Design Request
PN: N10312, CIP: 801096
July 23, 2024
Rod Jackson/ Jessica Carlson
Item No.: 8j_Supp
Date of Meeting: July 23, 2024
Updated Overview
• Project Information
• Project Scope
• SEF (sustainable Evaluation Framework)
• Cone of Certainty
• Schedule
2
Project Information
C15 is the centerpiece of Fishermen’s Terminal and includes:
• A waterfront plaza, Port of Seattle offices, tenant office space, restaurants, and
stores. The multi-use building is operational 7 days a week.
Project details:
• Sponsors: Jennifer Maietta, Director RE Asset Management and Jessica Carlson
Senior Real Estate Manager
• Current Estimated Project Cost: $16,387,000
• Current Estimated Construction Cost: $12,505,000
• Previously Requested Authorization: $300,000 for Seed money
TODAY’S REQUEST:
Request Commission Authorization of $500K for July 23
rd
2024.
3
Project Scope
4
Project Scope:
• C-15 building roof overlay, insulation
gutters, rooftop vents
• Solar panels
• Cladding and insulation
• Update Storefront doors and thresholds
• Triple pane windows
• Tower Structure repairs
• Art – Mary Coss
• RGB LED and Plaza Lighting
• Bike Lockers, Community Board, Picnic
Tables
• Biofiltration Planters and oyster barrels
Architectural Rendering of C15 with Solar Panels and New Facade
Sustainable Evaluation Framework
5
• Building Energy
– Rooftop solar
• 10-20% of building energy use
• ROI 10 years
• Lifetime Carbon Reduced: 96 tCO2e
– Cladding, insulation, LED lighting, triple pane
windows, exterior sun shades
• 46% building energy use reduction
• ROI: 40 years
• Lifetime Carbon Reduced: 955 tCO2e
Note: Estimates are all rough-order-magnitude based on preliminary pre-design assumptions
Waste
Salvage windows and metal siding (11.5 tons)
Stormwater
Install stormwater treatment on downspouts
Materials
Procure select red list free materials
Equity
Improve plaza lighting
Keyless bike lockers
Community board
Picnic tables
Update doors and thresholds for accessibility
Cone of Certainty
6
We are here
Preliminary Schedule
Acquisition Planning UPDATE June 13, 2024
Commission Authorization - Design July 23, 2024
Commission Authorization - Construction
2025 Quarter 1
Notice to Proceed
2025 Quarter 2
In-use date 2027 Quarter 3
7
8
Questions?
Questions?