T-91 LED Lighting Upgrades - Design
WP# N10343, CIP:C801297
June 11, 2024
Jennifer Maietta, Director, Real Estate Asset Management
Sam Hansen, Project Manager, Waterfront Project Management
Sarah Ogier, Director, Maritime Environmental & Sustainability
Item No.: 8d_Supp
Date of Meeting: June 11, 2024
Action Request
Request Commission authorization for the Executive Director to
complete design of LED lighting and controls upgrades at T-91.
This request is for $700,000 and would increase the total project
authorization to date to $750,000 out of a total estimated
project cost of $3,600,000.
2
Overview
Project Location
Project Scope & Sustainability
Community Outreach
Financial Implications
Preliminary Schedule
Summary Recommendation
3
Project Location – T-91
4
Pier 90
Pier 91
Uplands
Replace all existing pole
mounted lighting with LED
fixtures
Install new lighting control
systems
Install smart meters
Conduct small works lighting
demonstration at 30% design
stage
Project Scope
5
Project Sustainability
Advance the Ports Century Agenda sustainability goals
Objective 9: Meet all increased energy needs through conservation and renewable sources
MCAAP (Maritime Climate and Air Action Plan)
75% of Port managed spaces converted to LED by 2025
100% of Port and Tenant managed spaces converted to LED by 2030
Sustainable Evaluation Framework
Reduce greenhouse gas emissions and energy consumption by replacing high energy use
lighting with efficient LED lighting
Protect health and the environment by ensuring lighting does not leach zinc into the
Puget Sound.
Protect the community and aquatic habitat by limiting light pollution, utilizing directional shields,
and considering warm light tones
6
Community Outreach
Initial project information provided at Neighbors
Advisory Committee (NAC) on May 15th
Lighting demonstration planned at 30% design
stage to provide NAC members an opportunity to
provide input on project.
7
Financial Implications
ITEM THIS REQUEST TOTAL PROJECT
Design $700,000 $750,000*
Construction $0 $2,850,000
TOTAL $700,000 $3,600,000
8
Estimated Energy Savings: 612,356 kWh/yr.
Estimated Utility (SCL) Rebate: $171,739
Estimated Annual Utility Savings: $61,235
*Includes prior authorization of $50,000 seed money for planning
Preliminary Schedule
9
Commission Design Authorization
Community Outreach
2024 Q2
Design Start 2024 Q3
Commission Construction Authorization 2025 Q2
Construction Start 2025 Q3
In-Use Date 2026 Q2