Electric Vehicle Chargers for Aviation Fleet
Design & Construction
Authorization Request
Item No. 8e_supp
Meeting Date: May 28, 2024
Purpose:
• Enable electrification of high-use fleet
vehicles
• Reduce fleet greenhouse gas (GHG)
emissions and fuel costs
• Support Sustainable Fleet Plan and
Century Agenda goals
Scope:
• Install 15 Level 2 chargers in the
Parking Garage
• Install a mix of Level 2 and Level 3
chargers on the ramp of Concourse D
to support 7 vehicles
Project Purpose / Scope
2
• Completed in 2021
• Evaluates and recommends
strategies that reduce fleet GHGs
while meeting operational needs
• Strategies
– Electrification
– Renewable fuels
• Renewable natural gas (RNG) in buses
• Renewable diesel (RD) in heavy-duty fleet
– Right-sizing vehicles and fleet
Sustainable Fleet Plan
3
• Supports the purchase of at least
20 electric vehicles (EVs)
• Reduces Aviation fleet GHG
emissions by 20%
– 175 metric tons per year
• Reduces annual fuel cost by
$85,000
Benefits
4
Project Location – Airfield (D Annex)
5
Project Location – Parking Garage
6
Project Cost and Schedule
Cost Breakdown This Request Total Project
Design Phase $879,000 $1,128,000
Construction Phase $1,819,000 $1,819,000
Total Project $2,698,000 $2,947,000
Schedule:
• Design Complete: Q3 2024
• Major Construction begin: Q1 2025
• Final asset in-use: Q2 2025