Project Scope
Project Work:
• Demolition of the existing Fishermen’s Terminal Bank Building (Building C-12) to
existing slab
• Abatement of regulated materials
• Small amounts of material salvage such as the bank vault door
• Removal of existing landscaping including curb and gutter on the site
• Capping of the utilities (water, sewer, electric); A handhole will be installed for the
electricity to provide for access for temporary power connection for construction
job shack in future
• Crushed rock will be placed in existing landscape area
4