C800556 – NSAT Modernization
Wide Body / Common Use
Gate N16
Item No. 8k_supp
Meeting Date: April 26, 2022
Purpose & Scope
2
Purpose:
Provide full functional Wide Body capacity at the North Concourse gate N16.
Project Scope:
• Replace the undersized 400Hz units and conductors
• Replace the undersized PC Air units and supply piping
• Replace and relocate existing lighting poles with 80’ poles
• Add one additional SafeDock unit to align with Wide Body position
• Refresh lead-in lines and safety envelopes as required
• Replace/reinforce gate area apron structures and panels.
2
North Satellite – Gate N16 Wide Body
3
Schedule
CIP: C800556
Key Schedule Milestones:
• Design Start: Q2 2021
• Construction Start: Q3 2022
• In-Use Date: Q4 2022
4
Risks and Mitigation
5
• Risk: Gate Availability
– Mitigation: Ensuring the Gates can be shut down in order to complete the work
• Risk: Schedule
– Mitigation: Maintaining the construction schedule to minimize gate outages
5
Action Requested
6
Request Commission authorization for the Executive Director to
execute a major public works construction contract to provide
full functional wide body aircraft capacity at the Concourse N
gate N16. This construction contract will provide flexibility to
accommodate a wider array of aircraft to support wide body gate
service.
This work is being completed as part of the original North Satellite
Modernization at Concourse N project.
6