Major Scope
• Install new fire sprinklers throughout the Main Terminal
(Ticketing, Esplanade, Mezzanine, and Baggage Claim) and
above both the departure and arrivals drives
• Add additional fire standpipes to meet current code
• Significant amounts of asbestos fireproofing remain in the
Main Terminal
• Install new smoke control exhaust
• Replace the existing emergency power generating system
4