COMMISSION AGENDA – Action Item No. 6e Page 2 of 5
Meeting Date: March 24, 2020
Template revised June 27, 2019 (Diversity in Contracting).
JUSTIFICATION
Resolution No. 3683 was adopted by the Commission on October 22, 2013. This resolution
included all recommendations from the Part 150 Study including sound insulation for
condominium complexes. The goal of this program is to meet the requirements of Resolution
No. 3683 to conduct an ongoing noise remedy program.
Diversity in Contracting
Since up to 80% of the project could potentially be funded with FAA AIP grants, the Port will
follow the United States Department of Transportation’s Disadvantaged Business Enterprise
(DBE) program requirements. Certified DBE goals will be administered in accordance with CFR
49 Part 26, by the Diversity in Contracting Department.
DETAILS
The Port will provide funding, staff, consultant and contractor oversight, and administration of
the program to provide design and Project/Construction Management for the sound insulation
of the Villa Enzian Condominiums. The construction company procured will provide
construction, construction oversight and quality control for the sound insulation renovations.
For sound insulation treatments to work properly, the windows and doors must remain closed.
The air becomes stagnant and the use of a positive ventilation system is required to circulate
fresh air throughout the home.
In return for sound insulation, the Homeowners Association (HOA) and each homeowner are
required to provide the Port with an Avigation Easement which will be recorded permanently
on the parcel with King County. An Avigation Easement provides the Port with protections for
free and unobstructed passage of aircraft over the parcel and becomes the Port’s asset.
Scope of Work
The company hired will provide construction, construction oversight and quality control.
Construction work will include:
(1) STC rated solid core doors
(2) STC rated windows
(3) Storm doors
(4) Positive air ventilation or air conditioning as required
(5) Other associated work determined to be necessary by the architect to install the
above items or to meet building and fire code
(6) Regulated materials abatement (asbestos and lead) necessary to facilitate these
installations