Founded in 1911 by a vote of the people as a special purpose government, the Port of Seattle’s mission is to promote economic opportunities
and quality of life in the region by advancing trade, travel, commerce, and job creation
in an equitable, accountable, and environmentally responsible manner.
COMMISSION REGULAR MEETING AGENDA
December 10, 2019 PRELIMINARY AGENDA
To be held in Commission Chambers at Pier 69, 2711 Alaskan Way, Seattle
ORDER OF BUSINESS
11:00 a.m.
1. CALL TO ORDER
2. EXECUTIVE SESSION – if necessary, pursuant to RCW 42.30.110 (executive sessions are not open to the public)
► 12:00 noon – PUBLIC SESSION
Reconvene or Call to Order and Pledge of Allegiance
3. APPROVAL OF THE AGENDA (at this time, commissioners may reorder, add, or remove items from the agenda)
4. EXECUTIVE DIRECTOR’S REPORT
5. PUBLIC COMMENT – procedures available online at https://www.portseattle.org/page/public-comment-port-commission-meetings
6. UNANIMOUS CONSENT CALENDAR (consent calendar items are adopted by one motion without discussion)
6a. Approval of the minutes of special meetings of November 12 and 19, 2019. (no enclosure)
6b. Approval of the Claims and Obligations for the period of November 1, 2019, through November 30, 2019, including accounts
payable check nos. 932772-933135 in the amount of $4,609,200.02; accounts payable ACH nos. 021763-022455 in the amount
of $69,398,379.66; accounts payable wire transfer nos. 015247-015261 in the amount of $11.407.480.34, payroll check nos.
194731-195108 in the amount of $457.433.24; and payroll ACH nos. 938492-944904 in the amount of $17,638,254.57 for a fund
total of $103,510,747.83. (memo enclosed)
6c. Authorization for the Executive Director to execute a contract totaling $329,000 for disposal for the Motor Vessel Fire Boat Alki.
(abbreviated memo and presentation enclosed)
6d. Authorization for the Executive Director to (1) develop, advertise, and execute a Public Works Building Engineering Systems
Contract and (2) authorize the use of port crews for preliminary work in support of the Fire Pump Replacement Project at Seattle-
Tacoma International Airport. The amount of this request is $4,840,000 for a total estimated project cost not to exceed $5,000,000.
(CIP #C800794) (memo and presentation enclosed)
6e. Authorization for the Executive Director to (1) execute an Agreed Order with the Washington State Department of Ecology to
complete a sediment Remedial Investigation at the port’s Terminal 91 property; (2) procure and execute a project-specific contract
to complete the scope of work required by the Ecology Agreed Order and future amendments; and (3) execute a Corrective Action
Permit Renewal application as required by Ecology and EPA for the T-91 facility. (memo, agreed order, and permit application
enclosed)
6f. Authorization for the Executive Director to complete design and permitting of approximately 1,120 feet of replacement fender
system at Terminal 91 in the amount of $800,000 of a total preliminary estimated project cost of $6,600,000. (CIP # C801097)
(memo and presentation enclosed)
6g. Authorization for the Executive Director to increase project authorization by $200,000 to support design and construction for the
Emergency Generator Controls Upgrade project at Seattle-Tacoma International Airport. Total project authorization is $1,000,000,
for a total estimated project cost of $2,500,000. (CIP C800784) (abbreviated memo enclosed)
6h. Authorization for the Executive Director to (1) prepare design and construction bid documents for the Building Controls Upgrade
Project at Seattle-Tacoma International Airport; and (2) use port crews for preconstruction activities. The amount of this request is
$2,950,000 of an estimated total project cost of $10,000,000. (CIP #C800944) (memo and presentation enclosed)
6i. Authorization for the Executive Director to proceed with design of the Rental Car Facility Camera Replacement project at Seattle-
Tacoma International Airport in an amount not to exceed $670,000 of a total estimated project cost of $2,254,000. (CIP #C800975)
(memo and presentation enclosed)