Item No: 8c_Supp Date: December 10, 2019 Pier 66 Shore Power Capacity and Connection An early action of the Seattle Waterfront Clean Energy Strategic Plan Seattle Waterfront Clean Energy Strategic Plan Vision: Modernize the electricity grid to provide clean energy for maritime industry • Build partnerships between electric utility, Port, industry • Take a holistic approach to planning for an electric future • Co-develop resilient, reliable, clean, affordable, maritime energy systems • Enable and support the transition away from fossil fuels 2 The Impact of Shore Power • 93 percent of electricity in Seattle comes from low carbon, low cost sources, like hydroelectricity • All ships that use Seattle's clean electricity instead of fossil fuels at berth reduce CO2-which causes climate change-and harmful air pollutants like SOx, NOx and Diesel Particulate Matter 3 Pier 66 Shore Power - Early Action • Pier 66 is an early action of the Seattle Waterfront Clean Energy Strategic Plan • Implement electrification actions with high impact GHG reduction results • Future expansion of shore power to other terminals as well as other harbor activities 4 Pier 66 Bell Street Cruise Terminal • Commissioned in 1999 • Single berth facility and home port to Norwegian and Oceania vessels • Recent upgrades to accommodate newest NCL vessels • Currently, shore power is not available: challenging location in downtown grid 5 PIER PIER6666BELL BELLSTREET STREET CRUISETERMINAL TERMINAL CRUISE SUBMARINE CABLE TERMINAL 46 / PIER 66 SUBMARINE CABLE FROM TERMINAL 46 TO PIER 66 TERMINAL 46 EQUIPMENT & EQUIPMENT AND DUCT DUCTBANK ON T46 TERMINAL 46 BANK ON TERMINAL 46 OFFSITE 26kV SERVICE FROM CITY LIGHT 6 Next Steps • Design Funding Authorization (today) • Design Development and Permitting: Early 2021 • Construction Funding Authorization Request: Early 2021 • Pier 66 Shore Power Ready for the 2022 Cruise Season 7