Scope
• Area 1: Reconstruction of the Asphalt Concrete Pavement (ACP) at Cargo 2 east laydown area.
• Area 2: Reconstruction of the Portland Cement Concrete Pavement (PCCP) and ACP at the Vehicle
Service Road, Cargo 2, Cargo 3, and Industrial Waste System utility upgrade.
• Area 3: Reconstruction of the ACP at North Satellite taxilane shoulder and the apron south of the
Airport Rescue and Fire Fighting station.
• Area 4: Reconstruction of the PCCP at Taxilane W and Taxiway B at the north entrance to the South
Satellite.
• Area 5: Reconstruction of the PCCP at Taxilane W and Taxiway B at the south entrance to the South
Satellite.
• Area 6: Replacement of individual PCCP (w/ Quick-Set Panels) and Joint seal on Taxiway B.
3
The 2020 projects are comprised of the following 6 Work Areas: