Scope
• Decommission and remove existing mounting hardware and outdated Safedock and
Ramp Information Display units.
• Install Safedock units with video cameras and apron scanning at the B, C, and D
Concourses and the South Satellite.
• Provide the network connectivity to allow data and gate usage metrics gathered
from the A-VDGS units to feed into a centralized database for use by staff and the
airlines.
• Re-route existing network cabling from local communication rooms to STIA’s newly
installed micro-distribution cabinets.
• Testing and commissioning of all systems, software, user interfaces and data
collection.