COMMISSION AGENDA – Action Item No. _6d___ Page 2 of 4
Meeting Date: September 24, 2019
Template revised June 27, 2019 (Diversity in Contracting).
Post bid commentary from some plan holders indicated that they received higher than
anticipated bids from their subcontractors for steel, metal wall panels, glazing, metal stud
framing, tile installation, plumbing and electrical. Plan holders also indicated that they had
difficulty getting subcontractor bids and that they felt the logistics, traffic control, safety
provisions, and security associated with working on the ramp level (required for construction)
also increased their bid amounts.
JUSTIFICATION
The public restrooms on Concourses B, C, and D are old, outdated and overcrowded. They are
difficult to maintain due to the age of the finishes and fixtures, have endured water infiltration
and damage, and have limited air circulation and odors that have penetrated the finishes. Of
the existing eight pairs of restrooms, three have not been remodeled since 2001, and five have
not been renovated since their construction in 1992. Additionally, because of passenger traffic
growth, the existing restrooms are too small resulting in long lines during peak periods of use.
This phase will renovate the existing public restrooms near gate D6 to improve maintainability,
accessibility and passenger experience.
Diversity in Contracting
This procurement included an inclusion plan and the low bidder demonstrated sufficient
affirmative efforts to outreach to and utilize DBE subcontractors.
Scope of Work
Renovate and enlarge one set of restrooms on Concourse D. This work includes building new
space for restrooms over an active drive lane which is heavily used by tug traffic.
Schedule