COMMISSION AGENDA – Action Item No. _6f__ Page 2 of 5
Meeting Date: July 9, 2019
Template revised September 22, 2016; format updates October 19, 2016.
maximum contract amount. This contract will have a 3-year base contract period, with two 1-
year options for renewal, at which time the Airport may issue further Service Directives.
Competitively procured IDIQ contracts, are widely used public-sector contracting tools,
consistent with the Port’s General Delegation of Authority, and governed by the Central
Procurement Office policy (CPO-1 policy).
JUSTIFICATION
The Airport estimates thirteen (13) additional PLBs, fixed walkways, and associated gate
equipment that may need design services for complete replacement, by the end of 2023. These
PLBs are divided amongst several existing and future Capital Improvement Projects (CIPs)
sponsored by Aviation Operations, Facilities and Infrastructure, and Maintenance. The CIPs are
detailed below:
The PLB Phase 2 project (CIP C800793) is budgeted for $10,000,000, which has 3 PLBs
remaining that have design service requirements.
Facilities and Infrastructure is considering an additional 4 new PLB’s and associated gate
equipment to a new CIP.
The SafeDock Upgrade and Expansion project (CIP C800779) is budgeted for
$27,972,250, which is installing SafeDock throughout STIA. SafeDock is an infrastructure
improvement to PLB operation and ramp safety. Following installation of this system, all
PLBs renewed will require SafeDock, which in turn requires additional design be
performed.
In general, the scheduling of a PLB replacement project is relatively unpredictable and highly
dependent upon operational and capacity concerns. Utilization of this type of IDIQ contract has
proven to be an efficient, cost effective, and flexible method of responding to uncertain design
requirements over a multiple year span. Once the Service Agreement is executed, individual
Service Directives will be negotiated and executed before any design work is performed.
Diversity in Contracting
Project staff, in coordination with the Diversity in Contracting department, have set a 15%
woman and minority business enterprise (WMBE) aspirational goal for this IDIQ contract.
DETAILS
This request is to execute one (1) IDIQ valued at $5,000,000, which will be awarded to the
highest ranked firm.
This contract will have a 3-year base contract period, with two 1-year options for renewal. The
actual contract duration may extend beyond five years to complete the work identified in a
specific Service Directive. The Port will not issue any Service Directives in excess of this
contract’s value, or after expiration of the contract ordering period.