MIDWAY SEWER DISTRICT CONNECTION CHARGE CALCULATION QUOTE# Pos #3:1 (206) 787-5870 DATE: Nov. 14 2018 SeaTac Airport--------SeaTac Airport NAME: Port of Seattle PHONE: PROPOSED USE OF PROPERTY: PROPERTY ADDRESS OR LEGAL DESCRIPTION: YEAR SEWER(S) CONSTRUCTED: 2018 2018 Sec3 3 23 N 4 E I 1/4SEC .-TWP .- ___ _ _ _ _- _ _ _- _ __ DIAGRAM (NOT TO SCALE} THIS QUOTE IS FOR BACK GFC'S ONLY GENERAL FACILITIES CHARGE: RESIDENTIAL CUSTOMER EQUIVALENT: 0 X $3,900 = $0.00 0 X $3,120 = $0.00 MULTIPLE RESIDENTIAL UNITS: COMMERCIAL AND INDUSTRIAL PROPERTY (SEE SEPARATE CALCULATION FOR POINT TOTAL} (POINT TOTAL IS BASED ON THE PLUMBING FIXTURE COUNT - 1 PT= $195.00, 20 PT. MINIMUM) = COMMERCIAL: 2368 PTS. X 195 / PT $461,760.00 HISTORICAL METHOD FT. DEPTH: 150 FT. DEPTH: 150 STUB CHARGE TOTAL GENERAL FACILITIES CHARGE= $461,760.00 FEET = 0 FEET = 0 2000 /STUB = SUBTOTAL $0.00 X 0.00% INT. = INTEREST (10 YEAR MAX. ACCRUAL} = GENERAL FACILITIES CHARGE (SEE ABOVE CALCULATION ) = TOTAL CONNECTION CHARGE BASED ON THE HISTORICAL COST $0.00 $0.00 $0.00 $0.00 $0.00 $461,760.00 $461,760.00 CURRENT METHOD X FT. 0 $150.00 PER FT. DEPTH: 150 X 0 FT. $150.00 PER FT. DEPTH: 150 X 2000 STUBS S TUB CHARGE: 0 GENERAL FACILITIES CHARGE (SEE ABOVE CALCULATION ) TOTAL CONNECTION CHARGE BASED ON CURRENT COST $0.00 $0.00 $0.00 $461,760.00 $461,760 .00 $150.00 PER FT. $150.00 PER FT. STUBS 0 X X X FEET = FEET = /STUB = = = THE PRICES QUOTED ABOVE ARE VOID AFTER DECEMBER 31, 2018 OR IF THE PROPOSED USE OF THIS PROPERTY IS ALTERED IN ANY WAY! DISTRICT APPROVAL BY:=..,,.,,...,,.�===�c=-CALCULATED BY: __________ MANAGER, MIDWAY SEWER DISTRICT CHECKED BY: __________ PLEASE MAKE CHECKS PAYABLE TO MIDWAY SEWER DISTRICT. 3030 S. 240TH ST. KENT WA 98 DELIVER TO THE CASHIER.