Item No. 9b_supp Meeting Date: October 23, 2018 Baggage Optimization Third Quarter Briefing and Project Update AGENDA • • • • • • • • Project Overview 2018 Quarter 3 Update Budget Schedule Challenges Accomplishments Progress Sustainability Baggage Optimization Project 2 PROJECT OVERVIEW • Replaces six individual baggage screening systems with a centralized system that optimizes the operation and functionality of the checked baggage system Key elements: • 60 Million Annual Passengers (MAP) • Reliability • Redundancy • Security Complete Overhaul of Outbound System 3 2018 Q3 Update • Schedule - Contractor Falling Behind on Submittals and Fabrication • Phase 1: - Contractor Maintaining Two Work Shifts (Mon. through Fri.) - Conveyor Installation is ongoing (Critical Path) • Phase 2: - 100% Design Documents - Reviewing Phase 2 estimates - Developing Phase 2 Bid Documents Phase 1 Schedule Concerns 4 FINANCIAL PROGRESS REPORT Millions Authorization Summary Capital Expense Total Current Budget $444.90 M $0.15 M $445.05 M $400 Current Authorization $136.16 M $0.15 M $136.31 M $350 Amount Remaining to be Authorized $308.74 M $0 M $308.74 M $450 $300 $250 Total Project (Capital + Expense) $200 Budget Spent to Date Forecast at Completion Variance Soft Cost $64.99 M $23.01 M $64.99 M $0 M $50 Construction $359.43 M $35.55 M $359.43 M $0 M $- Management Reserve $20.63 M $0 M $20.63 M $0 M $445.05 M $58.56 M $445.05 M $0 M $150 $100 Management Reserve Remaining Construction Spent Soft Cost Spent Construction Remaining Soft Cost Remaining Financial Breakdown - Project Tracking Within Authorized Budget 5 FUNDING CONTRIBUTION (Port Contribution to Date $31.7M) Port $351M 79% (TSA Contribution to Date $27.0M) TSA $94M 21% Total Project Budget Total TSA Contribution Total Port Contribution Amount Spent to Date TSA Reimbursement to Date TSA OTA/LOI Reimbursement $445,050,000 $94,043,296 $351,006,704 $58,566,741 $27,005,449 6 SCHEDULE Contractor Delay Extends Overall Completion Date 7 SMALL BUSINESS/APPRENTICESHIP UTILIZATION SCS/SBE APPRENTICESHIP Overall (15%) SBE Const (15%) Women (10%) SCS Const (5.0%) 0.0% Minority (15%) 50.0% 100.0% 150.0% 200.0% 250.0% Goal Actual Tracking Close to or Exceeding Goals 0.0% 50.0% Goal 100.0% 150.0% Actual 8 CHALLENGES • Phase 1 Construction Schedule • Baggage Handling/Steel Market Conditions for Phase 2 Bid • Operational Impacts Through Construction • IAF Coordination - IAF must be operational prior to Phase 2 SSAT construction • Project Coordination - Have coordinated with 48+ projects so far Overcoming Challenges 9 ACCOMPLISHMENTS • Continuous delivery and installation of new conveyors. • 100% Phase 2 Design Documents reviewed. • New CT Ramp Construction complete. • Maintenance breakroom in Concourse B complete. • Conveyor Factory Acceptance Test (FAT) conducted, retest scheduled Q4 • Continued construction on utilities and infrastructure. Baggage Optimization Construction Progress 10 SUSTAINABILITY Energy Conservation Optimized system is projected to result in up to 30% energy savings Water Conservation No opportunity Working Environment Improved ergonomics Waste Reduction Contractual requirement to recycle demolished material when possible Opportunity in Energy Conservation 11 New Conveyor Sections 12 North EDS Screening Matrix 13 CTE Bump Out - Steel Installation 14 Factory Acceptance Testing - Detroit, MI 15 Drive In A Box Network Testing - Louisville, KY 16