COMMISSION AGENDA – Action Item No. _8b_ Page 2 of 5
Meeting Date: June 26, 2018
Template revised September 22, 2016; format updates October 19, 2016.
Staff has developed a preliminary business case that shows a positive return on investment.
Further detailed planning, programming, and project definition is needed to ensure both costs
and revenues are feasible and viable.
DETAILS
The C1 Building is an existing three-level structure that was built to house the C1 in-line
baggage screening system (on the baggage claim and bridge levels) that supports Alaska
Airlines. Additionally, the building currently houses over 12,000 square feet of concession space
and nearly 12,000 square feet of administrative and operational space on the Concourse Level
leased by the Transportation Security Administration (see Attachment A, Slide 3).
During the design of the building, the airport contemplated a larger building with additional
floors. While it was not constructed this way, the building did incorporate the capacity to add
additional floors at a later time. However, the current plan adds more floors than were in the
original design and seismic codes have changed significantly. With that said, staff believes that
the C1 Building is currently the best and most cost-effective opportunity to expand for Airport
Dining and Retail (ADR), Tenant, and Passenger needs at Sea-Tac.
Airport staff has received specific requests from multiple tenants for expanded space currently
unavailable at Sea-Tac. Additionally, staff has validated demand for this expanded space as part
of the Airport Dining and Retail redevelopment plan, as well as early findings from a Terminal
Office Space study. This C1 Building project will provide needed space to meet the current
demand level, and additional future expansion will be required to meet future demand
forecasts.
A potential expansion concept has been developed as part of a previously authorized Planning
Services IDIQ. (see Attachment B, video)
With this authorization the project team will be able to confirm the project justification and
business case, tenant program requirements, preferred alternative, project budget, and a
detailed phasing and delivery program.
The proposed C1 Building expansion project would provide expanded airport dining and retail
opportunities, expanded passenger restroom facilities, and a public meditation room on the
concourse and mezzanine levels. Demand for additional tenant office space and premium
passenger lounge amenities to meet existing demand, would be accommodated on the upper
levels.
Through this detailed C1 Building expansion project development, we will develop a phased
sequencing schedule and staff will be able to determine potential impacts to the current C1
Building tenants including ADR concessionaires.