Item No. 9a supp Meeting Date: June 12, 2018 South Satellite Infrastructure Upgrades Commission Meeting June 12, 2018 1 South Satellite Single Aircraft at South Satellite in the early 1970's 2 Design Concepts for Full Renovation Full Renovation: $850M - $1.6B 3 Potential Interim Improvements Areas being evaluated for potential investment in the near term. 4 Next Steps • Evaluate scope items • Package scope • Cost benefit analysis • Return for Authorization Staff will return for authorization of interim projects once all possible scope items have been evaluated. 5 Original Integration of Proposed Project to Larger Renovations $850M - $1.6B* 50 Year Building $12/22 M Original HVAC Project Scope: HVAC Only Full Renovation of South Satellite 2018 2022 Proposed $52 M Expanded Project Scope: • HVAC • Lights & Ceiling • Fire sprinkler system • Signage • Carpet • Full abatement $ Price TBD 2028 $1.2B - $2.2B** 50 Year Building Interim Renovations: Preserves work completed by proposed project Full Renovation of South Satellite (Project Start) *conceptual estimates assuming completion in 2028 ** additional escalation needs to be applied based on actual schedule Proposed project will accomplish immediate needs that should be addressed, pending interim renovations. 6 South Satellite Design vs Use of 47 year old HVAC System 7 HVAC Underperformance Affecting Passenger Experience Outdoor Temp: 30 Design Temp: 68-72 Actual Temp: 60 Outdoor Temp: 85 Design Temp: 68-72 Actual Temp: 80 Immediate need - Heating, Ventilation and Air Conditioning is no longer working as designed 8 HVAC Underperformance Limiting Non-Aero Opportunities Project would deliver increased HVAC capacity for Airport Dining & Retail 9 What the Project Accomplishes • • • • • • • Improved Passenger Experience Project Supported by Airlines Reliability - new equipment Increased HVAC Capacity (including ADR) Reduce energy consumption (lighting and HVAC system) Asbestos removal Constructability Improves Passenger Experience 10 Equipment New, replacement equipment includes: - HVAC air handler - Cooling and heating coils and heating water piping - Controls and variable frequency drives - Terminal distribution boxes - Diffusers - Motor control center - Light fixtures - Electrical infrastructure for lights and signage - Fire sprinkler system - Signage - Ceiling - Carpet Updates several pieces of outdated equipment 11 Improved Passenger Experience at the South Satellite Old vs. New Updated Ceiling Next Steps • Commission Action - 6/26/18 for added scope approval • Commission Action - 10/9/18 for budget increase and construction authorization • Commission Briefing - Q4 2018 for update on other interim projects for the South Satellite Six Month Look Ahead 13