Item No. 6f supp Meeting Date: June 12, 2018 Begin Clean-up Design on Lower Duwamish Waterway 1 4th Amendment to the Administrative Order on Consent •Begin the Cleanup Design for the upper third of the LDW • Approximately 2 miles •Continue monitoring fish tissue and water concentrations •Continue to fund the seafood consumption advisory efforts Port's cost $4-5M via Environmental Remediation Liability program 2 Cleanup Design Includes •Sampling to refine the extent and type of cleanup method •Engineer design drawings and specifications 3 Timeline 2016 2017 2018 2019 2020 2021 2022 2023 2024 ENR Carbon Pilot Study (AOC2) Pre-Design/Baseline Study (AOC3) Cleanup Design of the Upper Third (AOC4) Seafood Consumption Advisory (AOC1, AOC3, and AOC4) Construction 4