COMMISSION AGENDA – Action Item No. 6c Page 3 of 4
Meeting Date: May 8, 2018
Template revised September 22, 2016; format updates October 19, 2016.
The City and the Port agree that the City’s conveyance by deed of 13,854 SF of real property to
the Port constitutes adequate consideration for the Port’s conveyance to the City of a street
use easement totaling 7,847 SF, a slope easement totaling 12,370 SF, a reduction to an existing
trail easement of 1,342 SF, and the Port’s conveyance to the City of a temporary construction
easement totaling of 253,509 SF. The City and the Port agree that the benefits to each from the
conveyances by the other are equivalent and therefore constitute adequate consideration.
Transfer of City Property to the Port:
Upon completion of the roadway improvements, the City will convey to the Port by quit claim
deed the 13,854 SF of property. The City will reserve the following easements in its conveyance
to the Port:
- Slope Easement for the City
- Utility Easement for Seattle City Light, Verizon, and Comcast
- Trail Easement allowing for future re-alignment of the existing trail
- Temporary Construction Easement allowing for the construction of the Stream
Improvements. The stream in its future configuration may not require a permanent
easement in favor of the City. In the event it does, the Parties commit to entering into
such easement at a later date.
Easements provided by the Port to the City:
In addition to the street use easements, the Port will grant the following easements to the City
for construction activities:
Temporary Construction Easement
- revising connections to Stormwater Facility #4
- stream re-channelization/floodplain construction
- grading and restoration adjacent to stream re-channelization and road construction
- contractor staging areas for both the stream re-channelization and road construction,
and for possible adjustment of the location of utilities
Trail Easement
- Easement in favor of the City for 155 SF.
- There is currently recorded on Port property in favor of the City an easement 2,285 SF.
- Upon completion of Stream Improvements, the Port will remove the 2,285 SF from the
easement, and grant a trail easement to the City on a revised area of 788 SF.
Beyond the easements provided by the Port, there are no financial implications to the Port
related to these agreements.