COMMISSION AGENDA – Action Item No. 6d_Attach_B Page 2 of 5
Meeting Date: November 14, 2017
Template revised September 22, 2016; format updates October 19, 2016.
which provides a 20 year design life, encompassed dig-out and replacement of pavement near
some catch basins and a 2.5 inch asphalt overlay in other affected areas.
This work will significantly extend the life of the paving at Shilshole Bay Marina, while also
improving its environmental performance by incorporating pervious pavement sections in non-
traffic bearing areas.
DETAILS
The replacement and overlay improvements proposed will extend the life of the parking lot
pavement for 20 years, or more
Scope of Work
The scope of work consists of full depth replacement of failed areas of asphalt pavement, edge
grinding and a 2.5 inch overlay of other areas and full restriping of the parking areas. No
significant changes to the traffic flow, islands or channelization are planned as part of this work.
The parking areas will retain the current angled parking configuration, which is the tenants’
strong preference as expressed at public meetings and open houses.
The work will also include areas of pervious pavement, both in fully reconstructed areas, and
along the parking strips where the vehicles meet bumper to bumper. This pavement, along
with a new stormwater filtration system at the north end of the parking area, not only satisfies
stormwater requirements but provides additional storm water treatment of parking lot runoff.
Small Business
The project team will coordinate with the small business group to maximize opportunities for
small business participation either as direct contracts or through subcontract opportunities.
Schedule
Paving work is seasonal and generally should be completed before mid-October. Phasing
language is being incorporated in the contract documents to limit the disruption to parking and
ongoing marina operations during construction, allowing for no more than 200 parking stalls to
be affected at any given time. Staff will work with the contractor to give as much advance
warning of any closures to tenants as possible.
Activity
Commission construction authorization