COMMISSION AGENDA – Briefing Item No. __7a__ Page 2 of 4
Meeting Date: July 25, 2017
Template revised September 22, 2016.
Port staff comprised of Aviation Operations, Aviation Project Management Group, Public
Affairs, Environmental and Construction Management conducted an internal alternative
selection workshop to review the twelve proposed alternatives. The alternatives were assessed
and weighed against a combination of public interest and Port objectives. Four removal
alternatives and three replanting alternatives were selected from the initial twelve.
Alternatives eliminated from further consideration included those relying upon tree topping
and lighting to mitigate the obstructions. Tree topping alternatives were not considered
further as this action would create raptor nesting habitat and thereby increase wildlife hazard
to aircraft. Alternatives relying upon lighting obstructions were eliminated due to the number
of obstructions that would need to be addressed, the impact to airport operations and Federal
Aviation Administration guidance regarding vegetation and obstructions.
The remaining following four removal alternatives were considered feasible for both sites P-4
and P-5:
(1) Removal of existing obstructions (trees currently penetrating the Flight Safety
Corridor), potential obstructions (trees within 6’ of penetrating the Flight Safety
Corridor) and all understory vegetation (non-obstruction vegetation consisting of
smaller trees and shrubs growing beneath large trees).
(2) Removal of existing obstructions and potential obstructions with future obstructions
removed in 7 to 10 years as determined necessary (protect understory)
(3) Removal of existing obstructions only (protect potential obstructions and understory)
with potential obstructions removed in approximately 5 years and future obstruction
in 7 to 10 years as determined necessary.
(4) Phased removal of existing obstructions, potential obstructions and understory
The following three replanting alternatives were considered feasible for both sites P-4 and P-5:
(1) Re-establish a low-growing forest on-site
(2) Re-establish a low-growing forest on-site with a vegetation barrier
(3) Replace trees on-site and create a tall-growing forest in close proximity to sites P-4
and P-5
After selecting the four removal and three replanting alternatives, Port staff developed a plan
to engage the local community and gain their input on the preferred alternative.
Community Engagement
The Port hosted a Public Workshop on June 5, 2017 to seek public input on the removal and
replanting approaches for sites P-4 and P-5. Attendees received presentations on the removal
alternatives and replanting alternatives. Port staff and consultants answered questions and
discussed concerns and issues regarding the various alternatives.
Attendees were asked to vote and provide their input on their preferred removal and
replanting alternatives. For the removal alternatives, the majority of the attendees selected