COMMISSION AGENDA – Action Item No. 6d Page 2 of 4
Meeting Date: April 11, 2017
Template revised September 22, 2016; format updates October 19, 2016.
procurement authorized by Commission in 2016. The new seating was selected based on best
value for total cost of ownership, comfort, aesthetics, maintainability, environmental benefits
and small business factors.
DETAILS
The seating bolts together in 4 to 5 seat benches that are stable, sturdy, and due to substantial
weight, are expected to remain in place. Based on the preferred layout, the project will install
benches perpendicular to the main walkway, with 2-seat airside benches at the ends of double
rows in some locations. Seating will be placed to maximize the number of seats in each
holdroom while also providing adequate circulation areas. ADA seating will be provided near
service counters at every gate. Floor receptacles will be provided to minimize cord runs from
seating and to keep these cords out of walkways for improved customer safety.
To distribute power for the new seating, the project will install new electrical panels on the
ramp level, with new circuit runs to all holdroom locations. Power bars for the seating are
raised and located between chairs, making access easy and convenient. Passengers will have
access to both 120V and USB outlets for charging personal devices such as cell phones and
laptops at the seating.
Scope of Work
The project will install new seating in all holdrooms throughout Concourse B and Concourse C in
layouts that optimize the number of seats and level of service in each holdroom. The project
will also install improvements necessary to provide power to all seating, to allow customer
access for 120V and USB device charging.
Schedule
The project will install the new seating by the end of 2017 including charging stations where
electrical power is currently available in the holdrooms. Electrical improvements required for
providing power at 100% of the seats will follow and will be performed through a major works
contract by the end of 2018.
Seating installation complete
Construction start - Electrical