Item No.: 4b Date: January 24, 2017 Terminal 91 Building C-173 Roof Overlay- Construction Funds Request Building C-173 Roof Overlay Building C-173 Existing C-173 Roof Approximately 29 Years Old 2 Existing Deteriorated Roof Elements Underside rusted canopy area Rusted underside of roof panel Hole previously repaired with coating Previous repair of metal roof at rusted location Hole previously repaired with coating Mechanical room penetrations Existing Deteriorated Roof Elements 3 Incorporate Sustainable Elements • • • • • Increase Insulation Value Utilize Reflective Overlay Material Recycling of Demolished Materials Durable Roof System that can last 30 years as specified Selecting materials with limited toxicity and GHG emissions. Sustainable Elements 4 Project Alternatives Considered Alternatives Description Cost Implications Solar Alternative 1 • Maintain Status Quo. • Continue to pay maintenance cost. (Approximately $9.8K/yr) $9.8K Alternative 2 • Coat Roof with roll-on Coating System (10 year life) • Add Fall protection and Security ladders • Repeat roll-on coating again in 10 years $2.14M Alternative 3 • Replace Roof with PVC membrane (30 year life) • Add Fall protection and Security ladders • Install Thin Film solar panels and structurally upgrade the building $1.56M • Replace Roof with PVC membrane (30 year life) • Add Fall protection and Security ladders • This is the recommended alternative $1.56M Alternative 4 $5.53M Project Alternatives 5 Next Steps • • • • Complete Design Request Construction Authorization Construction Starts Construction Complete 4th Quarter 2016 1st Quarter 2017 2nd Quarter 2017 4th Quarter 2017 Roof Overlay Project Schedule 6 Any Questions? Any Questions 7