
COMMISSION AGENDA
Tay Yoshitani, Chief Executive Officer
November 22, 2011
Page 3 of 4
Network Analysis & Optimization. Through Network Analysis & Optimization, this
service will ensure reliable and optimized communication throughout the Airport’s
HVAC Control System's Building Level Network of field panels.
Automation Controls Analysis & Optimization. Automation controls can drift out of
calibration with changes in mechanical component performance characteristics, building
use, and climatic conditions. This service will extend equipment life, reduce energy
consumption, and reduce the risk of costly and disruptive breakdowns.
Controller Analysis & Optimization (Field Level Network). Through Controller
Analysis & Optimization, this service will ensure reliable and optimized performance of
the Airport’s Terminal Equipment Controllers throughout the HVAC systems.
Software Updates. Through this service, the Port will benefit from new features and
enhancements that will improve building operations, take advantage of the latest version
changes, while extending the life of the Airport’s earlier software (named APOGEE)
investment. This service will provide the Port with software and documentation updates
to our existing APOGEE software as they become available (approximately annually).
Business Protection & Recovery Services. Through this service the Port will receive
protection for our HVAC control system’s vital databases of business information from
unforeseen and costly catastrophic events (lightning strike, electrical power surge, hard
drive or controller failure, flood, physical damage, etc.). This service will provide
quarterly database back-ups.
Online Systems Support. This service will provide unlimited system and software
troubleshooting and diagnostics via modem and direct phone support. This service is
available through vendor in-house specialists during normal business hours.
FINANCIAL IMPLICATIONS:
Budget Status and Source of Funds:
Contract payments are included as a specific line item in the Aviation Maintenance Expense
budget. The funding source is the Airport Development Fund. Funding for future years will be
included in future Aviation Maintenance annual expense budgets as a specific line item.
ALTERNATIVES CONSIDERED AND THEIR IMPLICATIONS:
Alternative 1: Do Nothing. Do not execute a contract with Siemens. Because the system is
proprietary, we will be unable to maintain the system. Equipment failures will eventually occur.
This is not the recommended alternative.
Alternative 2: Attempt to execute the contract with another vendor. Because of the proprietary
nature of the software and hardware on the system, and the requirement for technicians to be
factory trained, this is not the recommended alternative.
Alternative 3: Execute a five (5) year contract with Siemens Building Technologies for the
services noted above. This is the recommended alternative.