maintenance and repair services for all elevators, escalators, and moving walks at the
Seattle-Tacoma International Airport, excluding the Rental Car Facility. Authorization
is being requested to execute Airport contracts via the statewide contract for service
over a five-year period through December 2016. The budgeted cost of this service for
the year 2012 is $3,062,000 including tax. Costs will be determined annually and
included in each forthcoming annual budget.
Request document(s): Commission agenda memorandum dated November 22, 2011, provided by
John Christianson, General Manager of Aviation Maintenance.
c. Authorization for the Chief Executive Officer to advertise and execute a major
construction contract and provide installation of computer hardware by Port staff for
the South Satellite Common-Use Infrastructure Expansion project at Seattle-Tacoma
International Airport, for $2,403,500 out of a total projected program cost of $2,909,500
(CIP #C800276).
Request document(s): Commission agenda memorandum dated November 28, 2011, provided by
Michael Ehl, Airport Operations Director; Peter Garlock, Chief Information Officer; and Wayne
Grotheer, Director of the Aviation Project Management Group.
d. Authorization to (1) advertise and execute a major construction contract and (2)
authorize Port Construction Services to perform regulated material management design
and monitoring for the C22 connection to C1 Baggage Handling System (BHS), C1
make up device 1 (C1-MK1) replacement at Seattle-Tacoma International Airport. The
amount of this request is $3,604,000. The total cost of the C22 BHS connection to C1 /
C1-MK1 Replacement / TC3 Replacement project is $5,335,000. The currently estimated
capital cost of the airline realignment is $38 – $42 million, and the total overall
estimated total capital and expense cost is $58 – $72 million (CIP #C800382).
Request document(s): Commission agenda memorandum dated November 28, 2011, and
attachment provided by David Soike, Aviation Facilities and Capital Program Director, and Wayne
Grotheer, Aviation Project Management Group Director.
e. Authorization for the Chief Executive Officer to authorize design of the Miscellaneous
Building Improvements – Airline Realignment at Seattle-Tacoma International Airport.
This authorization is for $1,721,000 of a total project cost of $7,922,000. The currently
estimated capital cost of the airline realignment is $38 – $42 million, and the overall
estimated total capital and expense cost is $58 – $72 million. (CIP #C800475).
Request document(s): Commission agenda memorandum dated November 28, 2011, and
attachment provided by Michael Ehl, Airport Operations Director, and Wayne Grotheer, Aviation
Project Management Group Director.
f. Authorization for the Chief Executive Officer to authorize design of the Airline Tenant
Improvements – Airline Realignment at Seattle-Tacoma International Airport. This
authorization is for $3,776,000. The currently estimated total expense cost of the
airline realignment is $20 – $30 million, and the overall estimated total expense and
capital cost is $58 – $72 million (CIP #C800475).