ITEM NO. __7b Supp__________ DATE OF MEETING: Oct 4, 2011 Aviation Division Capital Budget 2012 - 2016 Commission Briefing Follow up October 4, 2012 1 Introduction • Capital program reorganized to conform to commission guidance as follows: - Category A: Commission authorized/underway • Includes projects where some portion of budget is authorized - Category B: Pending 2012 authorization - Category C: Pending future authorization - Category D: Small projects (don't require Commission authorization) • No changes to project budgets or cash flows from 9/27/2011 presentation Page 2 Summary By Category Category A. Commission Authorized/Underway B. Pending 2012 Authorization C. Pending Future Authorization D. Small Projects Total Number of Projects 83 53 3 5 144 2011 Estimate 181,183 3,613 3,049 2,873 190,718 2012 255,773 69,619 16,413 3,242 345,047 2013 112,118 151,217 24,945 4,200 292,480 2014 42,274 97,562 33,927 4,200 177,963 2015 3,240 14,146 32,036 3,288 52,710 2016 9,500 750 208,221 3,000 221,471 2012-16 422,905 333,294 315,542 17,930 1,089,671 3 Category A: Authorized/Underway Description 1 Rental Car Fac. Construction 2 Aircraft RON Parking USPS Site 3 Terminal Escalators Modn 4 Highline School Insulation 5 FIS Improvements- Phase 1 6 Airfield Pavement Replacement 7 EGSE Rolling Stock 8 Cent Plant Preconditioned Air 9 GSE Electrical Chrg Stations 10 PLB Replacement-AR 11 Third Runway Construction 12 Loading Bridges Utilities 13 8th Floor Weather Proofing 14 North Satellite Seismic 15 Two New CTE Freight Elevators 16 Aviation Small Jobs 17 New Runway Land Acquisition 18 Rental Car Buses 19 BHS C22-C1, MK1, TC3 20 2011-2013 Roof Replacement Pro 21 Other (63 Projects) Total 2011 Estimate 78,092 350 7,419 119 4,611 5,059 15,078 371 2,441 5,129 167 2,423 25 177 2,192 132 12,311 578 204 44,305 181,183 2012 2013 2014 51,954 4,750 17,000 12,028 14,000 2,100 24,941 15,653 6,000 10,909 3,014 10,907 10,482 450 4,000 3,000 2,895 5,015 4,757 4,577 47,341 255,773 30,566 6,300 6,317 17,581 23,901 5,332 7,924 1,500 2,200 2,441 3,258 3,060 1,738 112,118 3,000 14,106 16,781 4,770 3,617 42,274 2015 2,740 500 3,240 2016 9,000 500 9,500 2012-16 51,954 38,316 37,406 35,126 31,581 26,001 24,941 20,985 13,924 12,409 12,014 10,907 10,482 10,160 6,441 6,258 5,955 5,015 4,757 4,577 53,696 422,905 4 Category B: Pending 2012 Authorization Description 1 Convert Ticket Zone 3 FlowThru 2 Perm Emergency Back-up Power 3 NSAT HVAC,Lights,Ceiling Repl 4 SSAT HVAC,Lights,Ceiling Repl 5 C60 - C61 BHS Modifications 6 Terminal Realignment 7 Vertical Convey Modn Aero Ph2 8 Cargo 2 West Cargo Hardstand 9 Garage Renewal/Replacement 10 Convert Ticket Zone 2 Pushback 11 Vertical Convey Modn Aero Ph1 12 Main Terminal HVAC Upgrades 13 Parking Retrofit 14 C60-C1 Interline Baggage Sys 15 Airport Owned Gate Infr II 16 New Window Wall Ticket Zone 1 17 Cargo 6 Enhancements 18 Facility Monitoring Sys Renewl 19 Service Tunnel Renewal/Replace 20 So. 160th St. GT Lot Expansion 21 Other (33 Projects) Total 2011 Estimate 125 200 300 232 50 177 25 2,504 3,613 2012 2013 2014 1,000 2,000 125 3,000 8,000 8,000 5,000 100 250 1,000 7,454 1,000 1,850 5,000 2,000 750 550 1,000 1,000 100 20,440 69,619 26,000 7,000 3,000 15,000 14,000 11,000 9,000 2,200 2,000 8,000 2,506 4,000 5,700 1,825 2,000 4,750 4,900 2,500 1,200 764 23,872 151,217 5,000 21,238 15,000 9,371 3,800 5,027 5,432 11,000 4,500 1,669 3,500 2,000 66 100 1,500 2,500 2,652 3,207 97,562 2015 2016 2012-16 - - 9,371 4,500 275 14,146 750 750 32,000 30,238 27,496 27,371 25,800 24,027 19,432 13,300 12,000 10,669 9,960 8,500 7,550 6,825 6,000 5,566 5,550 5,000 4,975 3,516 47,519 333,294 5 Category C: Pending Future Authorization Description 1 Aero and Non-Aero Allowances 2 CDP Future Projects 3 CTX UPS Upgrade Total 2011 Estimate 3,044 5 3,049 2012 2013 2014 2015 2016 16,363 50 16,413 24,920 25 24,945 33,427 500 33,927 31,036 1,000 32,036 125,000 83,221 208,221 2012-16 230,746 84,721 75 315,542 6 Category D: Small Projects Description 1 Small Jobs 2 Aviation Small Capital 3 AV/IT Small Capital Projects 4 Aviation Small Capital 5 Aviation Small Jobs 2011 Estimate 1,994 879 2,873 2012 300 1,742 1,200 3,242 2013 1,200 1,000 2,000 4,200 2014 1,200 1,000 2,000 4,200 2015 288 1,000 2,000 3,288 2016 1,000 2,000 3,000 2012-16 300 1,742 3,888 4,000 8,000 17,930 7 Capital Spending by Category 400 D 350 C-Allowance C 300 B A 250 200 150 100 50 2011 2012 2013 2014 2015 2016 8 Seaport Division Capital Budget 2012-2016 Commission Review October 4, 2011 Seaport 2012 Capital Budget Capital Budget Summary $'s in 000's 2012 2013 2014 2015 2016 2012-16 Commission Authorized/Underway Pending 2012 Authorization Pending Future Authorization Small Projects 11,636 17,538 0 1,400 3,190 2,990 42,070 1,200 1,400 2,300 54,780 1,333 0 3,000 72,100 1,025 0 2,878 76,300 1,000 16,226 28,706 245,250 5,958 Total 30,574 49,450 59,813 76,125 80,178 296,140 10 Seaport 2012 Capital Budget Commission Authorized/Underway $'s in 000's Street Vacation Related Projects T86 Grain Facility Modernization T10 Interim Development T91 Water Main Repl N of Bridge T5 Crane Cable Reels T18 Fender Replacement T30/91 Program Sea Sec Grant Rnd7 - TWIC Sea Sec 2009 ARRA - Sonar Sys Sea Sec Grant Rnd 7B-Bomb Robot Trk Cruise Cap. Allow. - CTA Lease Cruise TI Allowance - CTA Lease P91 Fender System Upgrade P90 C175 Roof Replacement Total Priority 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2012 2013 2014 2015 2016 2012-16 3,213 107 475 565 13 1,378 25 700 393 261 375 251 1,875 2,005 3,190 0 0 0 0 0 0 0 0 0 0 0 0 0 1,400 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7,803 107 475 565 13 1,378 25 700 393 261 375 251 1,875 2,005 11,636 3,190 1,400 0 0 16,226 Note: Highlighted line items are lease commitments 11 Seaport 2012 Capital Budget Pending 2012 Authorization $'s in 000's T25 South Redevelopment Phase 2 Seaport Green Port Initiative Sea Sec Grant Rnd 9 - Dive Van, 8 Cars Sea Sec Grant Rnd 10-Mobile Cmd Veh P66 Apron Pile Wrap Container Terml Strm Water Imp (Pilot) T- 86 Grain Facility - Cathodic Protection T104 Site Improvements Total Priority 1 1 2 2 2 2 2 3 2012 2013 2014 2015 2016 2012-16 12,200 470 880 588 500 1,000 900 1,000 0 1,090 0 0 500 300 100 1,000 0 800 0 0 500 0 0 1,000 0 2,500 0 0 500 0 0 0 0 2,500 0 0 378 0 0 0 12,200 7,360 880 588 2,378 1,300 1,000 3,000 17,538 2,990 2,300 3,000 2,878 28,706 12 Seaport 2012 Capital Budget Pending Future Authorization $'s in 000's T-91 Berth 6 & 8 Redev Phase 1 T-46 Development T91 Substation Upgrades Container Support Yd-3.5M TEU's #1 P66 Shore Power Second Gangway per Berth @ T91 T46 North Dock Replacement T91 Berth 6&8 Redev Phase 2 Dredge P90 East Waterway** T-5 New Cranes (4) T18 Rail Crossings** T108 Paving Overlay P86 Fishing Pier Replacement T- 91 Railroad Spur Upgrade T-115 Railroad Spur Upgrade T91 Ind Warehse & Office (replace C173)** Container Support Yd-3.5M TEU's #2** New Warehouse at Tank Farm Contingency Renewal & Replace. Total • • Priority 2 2 2 2 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 2012 2013 2014 2015 2016 2012-16 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1,000 30,000 1,000 1,000 0 0 0 0 0 270 0 150 150 0 0 0 8,500 12,000 5,000 1,000 0 7,700 3,500 0 0 0 0 0 2,920 0 960 900 0 0 10,800 10,000 12,500 10,000 500 0 5,000 0 1,000 0 0 22,000 0 0 0 0 0 0 0 11,100 10,000 0 10,000 0 0 0 0 19,000 13,000 0 23,000 0 0 1,300 0 0 0 0 0 10,000 24,500 25,000 2,500 30,000 13,700 4,500 20,000 13,000 0 45,000 0 3,190 1,300 1,110 1,050 0 0 21,900 38,500 0 42,070 54,780 72,100 76,300 245,250 Highlighted line items are lease commitments For projects marked with asterisk **, the cash investment is forecasted to take place in the 2017-2021 timeframe. 13 Seaport 2012 Capital Budget Small Projects $'s in 000's Small Capital Projects Preliminary Planning Seaport Technology Projects Seaport Fleet Replacement Total Priority 1 1 1 1 2012 2013 2014 2015 2016 2012-16 775 250 250 125 700 250 250 0 700 250 250 133 500 250 250 25 500 250 250 0 3,175 1,250 1,250 283 1,400 1,200 1,333 1,025 1,000 5,958 14 Real Estate Division Capital Budget 2012-2016 Commission Review October 4, 2011 Real Estate 2012 Capital Budget Capital Budget Summary $'s in 000's 2012 2013 2014 2015 2016 2012-16 Commission Authorized/Underway Pending 2012 Authorization Pending Future Authorization Small Projects 3,572 9,131 0 1,821 30 7,551 2,825 2,085 0 2,932 8,160 1,567 0 1,983 2,450 1,383 0 1,794 5,310 1,437 3,602 23,391 18,745 8,293 Total 14,524 12,491 12,659 5,816 8,541 54,031 16 Real Estate 2012 Capital Budget Commission Authorized/Underway $'s in 000's FT C15 HVAC Improvements Total Priority 1 2012 2013 2014 2015 2016 2012-16 3,572 30 0 0 0 3,602 3,572 30 0 0 0 3,602 17 Real Estate 2012 Capital Budget Pending 2012 Authorization $'s in 000's P69 N Apron Piling Cathodic Protection P69 Built Up Roof Replacement Bell Harbor Lighting Control Upgrade Tenant Improvements -Capital RE Contingency Renewal & Replace FT Net Shed Code Compliance FT Net Shed 9 Roof Replacement Bell Harbor Marina Pile Wraps P66 Chiller Upgrades FT C15 Bldg East Sewer Line FT C15 Bldg Subsidence Improvements Total Priority 1 1 1 1 2 2 2 2 2 2 2 2012 2013 2014 2015 2016 2012-16 3,923 300 160 1,148 500 750 450 500 300 850 250 0 1,692 600 259 500 1,500 0 500 0 0 2,500 0 0 0 432 500 1,500 0 500 0 0 0 0 0 0 483 1,000 0 0 500 0 0 0 0 0 0 433 1,000 0 0 361 0 0 0 3,923 1,992 760 2,755 3,500 3,750 450 2,361 300 850 2,750 9,131 7,551 2,932 1,983 1,794 23,391 18 Real Estate 2012 Capital Budget Pending Future Authorization $'s in 000's SBM Fuel Float & Building Improve SBM Central Seawall Replacement SBM Paving SBM Restroom Replacement FT Paving/Storm Upgrades FT C14 (Downey) Bldg Improvements T102 Bldg Roof Replacement FT C-2 Bldg Roof & HVAC Replacement FT NW Dock Improvements** FT S Wall W End Pile Repl & Corrosion Protect FT W Wall N Fender System Replacement** FT West Wall N Sheet Pile Corrosion Protect** FT Docks 3 Fixed Pier Improvements** FT Docks 4 Fixed Pier Improvements** FT S Wall Ctrl Fender Repl & Corrosion Protect** FT W Wall S Sheet Pile Corrosion Protect** FT C15 Bldg Roof Replacement SBM:Seaview Bldg A5 Rehabilitation Total Priority 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 2012 2013 2014 2015 2016 2012-16 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 500 915 100 800 150 110 100 150 0 0 0 0 0 0 0 0 0 0 500 0 450 2,000 1,500 380 2,330 1,000 0 0 0 0 0 0 0 0 0 0 0 0 450 2,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 460 0 0 100 1,250 200 200 200 200 0 0 2,400 300 1,000 915 1,000 4,800 1,650 950 2,430 1,150 100 1,250 200 200 200 200 0 0 2,400 300 0 2,825 8,160 2,450 5,310 18,745 Note: For projects marked with asteriks **, most or all of the cash investment is forecasted to take place in the 2017-2021 timeframe. 19 Real Estate 2012 Capital Budget Small Projects $'s in 000's Small Capital Projects Preliminary Planning Real Estate Technology Projects Real Estate Fleet Replacement Total Priority 1 1 1 1 2012 2013 2014 2015 2016 2012-16 815 250 250 506 1,050 250 250 535 525 250 250 542 500 250 250 383 500 250 250 437 3,390 1,250 1,250 2,403 1,821 2,085 1,567 1,383 1,437 8,293 20 Information and Communication Technology 2012 Capital Budget Commission Update October 4, 2011 21 Technology Capital Budget Overview Includes ICT Projects Budgeted in Divisions ICT Five Year Capital Plan Commission Authorized Projects Projects Pending 2012 Authorization Technology Small Capital ICT Allowance Totals 2012 8,631 6,300 6,450 21,381 2013 2,420 2,300 6,450 2,000 13,170 2014 2015 2016 1,700 10,650 12,350 788 10,800 11,588 500 11,000 11,500 2012-2016 Totals 11,051 8,600 15,888 34,450 69,989 Includes ICT Projects Budgeted in Divisions Excludes ICT Portions of PMG Lead Projects 22 Commission Authorized/Underway Commission Authorized Projects PeopleSoft Financials Upgrade Enterprise Maximo Upgrade and Consolidation Police Records Mgmt System Replacement Enterprise Project Delivery System Enterprise Property Mgt. System Upgrade (Propworks) Enterprise Maintenance Scheduling and Planning System FIMS II - Airport flight data and displays Airline Activity Management Airport Common Use Gate/Ticketing System Migration Totals N = New System U= System Upgrades or Replacements U U U N U N U N U 2012 2,700 400 500 200 200 52 4,214 280 85 8,631 2012-16 Totals 4,700 800 500 200 200 52 4,214 300 85 11,051 Project Budgets 5,000 3,782 1,300 1,525 450 402 $ 7,000 500 485 20,444 23 Pending 2012 Authorization Projects Pending 2012 Authorization ID Badge Enterprise System Replacement* Enterprise Network Switch Replacement* Contractor Data System (CDS) Upgrade/Replacement Computer Aided Dispatch Upgrade -Fire/Police LiveLink Construction Document Mgmt. Upgrade/Replacement Interline Baggage Reporting for Airport Airport Common Use Self Serve Kiosk Expansion Security Checkpoint Wayfinding (Wait times) at Airport Totals U U U U U N N N 2012 2,200 1,300 400 525 300 750 425 400 6,300 2012-16 Totals 2,200 1,300 1,500 525 1,000 750 425 900 8,600 Project Budgets 2,300 1,500 1,500 525 1,000 750 425 900 8,900 N = New System U= System Upgrades or Replacements *Assumes Authorization in 2011 24 Small Capital and ICT Allowance Small Capital and ICT Allowance Infrastructure Small Capital Seaport Small Capital Aviation Small Capital Real Estate Small Capital Business Applications Small Capital Enterprise GIS Small Capital ICT Allowance Totals 2012 2,500 250 1,200 250 2,000 250 6,450 2013 2,500 250 1,200 250 2,000 250 2,000 8,450 2014 2015 2016 250 1,200 250 250 288 250 250 10,650 12,350 10,800 11,588 11,000 11,500 250 2012-2016 Totals 5,000 1,250 3,888 1,250 4,000 500 34,450 50,338 25 Portwide Summay Capital Budget 2012 - 2016 Commission Briefing Follow up October 4, 2011 Portwide 2012 Capital Budget in $ 000's 2016 2012-16 449,185 Small Projects/Other 275,033 117,738 43,674 3,240 9,500 101,578 164,874 104,022 20,388 6,177 16,413 71,840 107,517 117,386 300,831 11,568 12,785 7,445 6,041 5,742 Total 404,592 Commission Authorized/Underway Pending 2012 Authorization Pending Future Authorization 2012 2013 367,237 2014 262,658 2015 147,055 397,039 613,987 43,581 322,250 1,503,792 27