COMMISSION AGENDA
Tay Yoshitani, Chief Executive Officer
May 13, 2011
Page 2 of 5
PROJECT JUSTIFICATION:
This pilot project will repair between two and five of the 308 existing pile caps at T-18 to
maintain their structural capacity and preserve existing revenues. As a pilot project, the results
will provide practical guidance to:
1) understand the extent and rate of deterioration of pile caps within our pier structures;
2) effectively analyze site conditions and more precisely determine when further repairs are
required;
3) prepare specific design documents and detailed project specifications;
4) reduce risk and cost associated with similar and expanded future pile cap repair and
maintenance actions; and
5) identify means to perform maintenance and repair actions while minimizing disruption of
cargo operations at marine terminals, avoiding negative impacts on Port tenants and
preserving revenues to the Port.
PROJECT STATEMENT AND OBJECTIVES:
Project Statement:
Conduct a pilot pile cap repair and maintenance project at T-18 for less than $1,000,000 by
end of 2012.
Project Objectives:
The purpose of this pilot project is to accomplish the following objectives:
• Accurately estimate material and labor costs
• Refine repair procedures to be more time and cost-efficient
• Identify effective means for construction access
• Document repair production rates for various identified repair solutions
• Reduce disruption to marine terminal cargo operations
• Reduce the cost, time and disruption associated with pile cap repairs anticipated at other
marine terminals
PROJECT SCOPE OF WORK AND SCHEDULE:
Scope of Work:
The repair and maintenance scope of work includes selecting a representative sample of pile caps
for repair and maintenance, selecting an array of alternative repair solutions to gain field
experience with each, and performing repairs to this representative sample of pile caps.
Alternative repair solutions may include any or each of the following:
Removal of cracked and corrosive concrete from the lower portion of the pile caps, cleaning the
exposed concrete surface, abatement of corrosion to existing reinforcing steel, installation of
cathodic protection systems, applying bonding agent to existing concrete, casting of new