Asphalt repair, standing water
issue. ~48 LF (1B-SW)
Asphalt repair, standing water issue. ~61 LF
(1P-SW)
Asphalt repair, standing water
issue. ~35 LF (2P-SW)
Asphalt repair, standing water issue.
~47 LF (3P-SW)
Asphalt repair, ~15 LF (4P)
Asphalt repair, standing water issue
~15 LF (2B-SW)
Asphalt repair (~200 LF)
(5P)
Re-pave parking area and re-paint
parking stripes and ADA logo; fill
space between back of curb and
sidewalk with HMA including
Tree Removal (8 trees), asphalt
repair (3B)
Begin bike path restriping