COMMISSION AGENDA
T. Yoshitani, Chief Executive Officer
September 15, 2009
Page 3 of 7
past year, there are relatively few projects or contracts that fall in the $200,000 to $300,000
range so this is not seen as a significant change. Having a consistent level of $300,000 for all
contracts would bring this type of contract authorization into line with others.
An additional issue is that Resolution No. 3605 allowed the CEO, without prior Commission
authorization, to approve small works construction contracts up to the monetary limit set by
RCW 53.08.120. This was done to keep our limits on contracting approvals no higher than those
mandated by the Legislature. In 2009, the Washington State Legislature passed HB 1196, as an
amendment to RCW 53.08.120, which raised the dollar amount for what could be considered
small works contracts from $200,000 to $300,000. Port staff has interpreted this change to
allow the CEO to approve contracts up to $300,000, resulting in four additional contracts
between $200,000 and $300,000 to be advertised since the legislation went into effect on July 26,
2009. No contracts have been awarded.
In Section 4.3, which covers Small Works contracts, an additional sentence will be added: “The
Commission shall review and approve any changes in authorization procedures affecting Small
Works contracting brought about by the amending of RCWs by the Washington State
Legislature.”
Increasing the level of purchased goods requiring Commission approval from $200,000 to
$500,000 and removing the conditional timing requirements.
This proposed change would authorize the CEO to procure “Goods and Purchased Services” up
to $500,000, so long as, where appropriate, such acquisitions would be approved as part of
normal monthly expenses. It removes the different requirements that were based on the length of
the contract, which was an unhelpful distinction. This provision reflects the necessity at times to
make major bulk purchases of materials for the day-to-day operation of the Port. For example,
the December 2008 snowstorm required the procurement of a large quantity of de-icing fluid for
the Airport’s runways, and the bulk purchase needed to be made quickly. The CEO currently has
the authority to execute multi-year contracts up to $200,000 without obtaining Commission
approval. Current language for one-year purchases or contracts does not require Commission
approval based on any specific amount, but only states it should be included in the Capital or
Operating Budget. Because the process for Commission approval will no longer depend on the
length of the contract, this will provide consistency and visibility to the process of approval for
purchasing goods and services. Commission approval for these contracts will be based on the
size of the purchase, as it should be, regardless of the term of the contract. A likely result of this
change is that more authorization requests would come before the Commission, thereby
providing greater oversight, visibility and transparency to these transactions. We estimate that
27 additional requests will come before the Commission for approval if the limit is set at
$200,000 and10 additional requests if the limit is set at $500,000.