AGENDA - Port Commission Revised Regular Meeting, August 11, 2009 Page 2
5. UNANIMOUS CONSENT CALENDAR** Continued
b. Authorization for Chief Executive Officer to amend four professional services contracts that support Investigations for the Lower
Duwamish Waterway (LDW) and Harbor Island superfund sites and provide notification to Commission in accordance with RCW
53.19.060 that the amendments exceed 50% of the cumulative value of the initial contract. (memo enclosed)
c. Authorization for the Chief Executive Officer to execute a Category 3 professional services contract for consultant support for
environmental investigation and associated regulatory coordination at T115N ranging from approximately $750,000 to $1,000,000.
(memo enclosed)
d. Authorization for the Chief Executive Officer to issue Change Order Number 010 for the North and South Satellites Food Courts
Flooring Replacement Project to add the additional time required, 61 days, to complete the project. (memo enclosed)
e. Authorization for the Chief Executive Officer to authorize all work, execute Category III procurement process, and execute all contracts
and amendments for photographic services to provide both scheduled and on-call photography and related services for a one-year
contract, with the option to renew for an additional two years. Estimated annual contract value of $80,000, with the option to renew for
up to three years, for a total procurement amount not to exceed $240,000. (memo enclosed)
f. Authorization for the Chief Executive Officer to handle requests for privileged documents by the State Auditor as part of the current
performance and accountability audits..(memo and Attachment enclosed)
6. DIVISION, CORPORATE AND COMMISSION ACTION ITEMS
a. Authorization for the Chief Executive Officer to authorize permitting, design and project management to be performed for the
completion of the South Wall reconstruction at Fishermen’s Terminal (FT) in the amount of $980,000. (memo enclosed)
b. Authorization for the Chief Executive Officer to:
1. Enter into agreements to complete design and permitting for the replacement of four (4) mooring dolphins at the north end of
Harbor Island, and
2. Procure long lead materials required to complete the above project within the current schedule.
The total amount of this request is $480,000. (memo and PowerPoint enclosed)
c. Request Chief Executive Officer authorization to perform full design documents; prepare, execute, award and amend service
agreements; and execute service directives for C1 to C88 Baggage Handling Connection Project at the Seattle-Tacoma International
Airport for an estimated cost of $280,000. The ultimate cost for the constructed project is estimated to be $2,800,000. (memo
enclosed)
d. Ratification of critical fender pile work at Terminal 91 in accordance with Resolution No. 3605. (memo enclosed)
7. STAFF BRIEFINGS
a. South Satellite Common Use Gate Strategy Briefing. (memo enclosed)
b. Terminal 30 Briefing. (memo and PowerPoint and short film (silent) enclosed)
Continued on next page