Lower Duwamish River Habitat
Restoration Plan
ITEM NO: 7b Supp
DATE OF
MEETING: May 5, 2009
Purpose of the Plan
• Bringing together different stakeholder groups to
identify habitat sites
• A proliferation of habitat in the coming years
• Demonstrating that habitat will not be at the
expense of maritime industry or other river users
Study Area
The Nature of Port Land Ownership
on the River
• Terminals
• Ribbon
Properties
Outreach Program -- Chronology
• April - lunch meetings with businesses
• April - project open house in Georgetown
• June - lunch hour bus tour
• July - series of three planning workshops, Georgetown
and South Park
• August - mail-back planning maps / surveys sent to
businesses
• November - 2
nd
open house for comments on draft plan
• December - SEPA comment period
Outreach Program – Indications of Success
• Adapted the structure of the
outreach program with
enhanced results.
• Use of the internet – 149
email addresses collected
from website alone.
• Cases of businesses being
very supportive of habitat in
proximity to their facilities.
Plan Content
• 31 habitat sites in total
• Even distribution of sites
throughout study area
• Total of 70 acres of habitat
• Translates to 30,000 lineal feet
of shoreline
• Plan has demonstrated
restoration and navigation can
coexist.
Two Changes to Stakeholder Input Received After
the Public Process
Maritime Business Stakeholder #1
•Six parcels associated with the business based at
7318 4th Avenue S. 1000’ of bank total.
•Business owner has requested eliminating all
habitat designations adjoining that property.
•Staff recommendation: No plan change.
Maritime Business Stakeholder #2
•Two parcels associated with the business based at
582 Riverside Dr. S.
•Business owner has requested eliminating all
habitat designations adjoining that property.
•Staff recommendation: Upon learning of plans for
new docks, staff recommends plan change to
remove habitat adjoining both of the parcels (a total
of 300’ of removed habitat).
The January 13
th
Plan’s Treatment of
the Two Stakeholders (Figure 9, p. 40)
Next Step
• Return soon to Commission for adoption of plan
as Port policy.
Summation
• Adopted plan will provide valuable framework
once the implementation mechanisms are
defined.