BUILDING CANOPIES
To prevent perching, roosting, or nesting by any species of bird above the walkways or other
areas that will be occupied by passengers, ¾ inch polyethylene bird netting, supported by a
stainless steel cable/bracket system will be mounted under the North Entrance Canopy, and both
the East and West Balcony Canopies. Tension wire, which prevents birds from perching, will be
installed upon any surfaces that will be below the plane of the netting. The bird netting is
uncomplicated to remove and replace, allowing for future maintenance needs.
ACCESS / EGRESS STAIRWAYS
There are four separate stairways to be treated. The deterrent in these locations will be bird
netting installed across the underside of the ceiling in the same manner as that used under the
adjacent canopies of the exterior passenger balconies. The netting will prevent entry into the
areas behind the support beams near the corners and along the top edges .There are some flanges
that are too low to be protected by the netting and these will be protected by installing a bird
slide on them. A bird slide is a product which creates an angle at which birds are unable to perch.
There are beam tops that will be protected by installing tension wire (bird wire) upon them.
SOUTH EXTERIOR BEAMS (SUNSCREENS)
Tension wire and bird slide will be installed on the exposed beams in this area to prevent birds
from perching and roosting.
ALTERNATIVES CONSIDERED/RECOMMENDED ACTION
1. Do nothing. Without action, not only will nesting and roosting be an issue, but the associated
droppings will become a problem. Bird droppings can be extremely toxic and disease laden
and could easily be tracked in to the cruise terminal. This is not the recommended alternative.
2. Install a comprehensive bird control system to discourage and prevent birds from nesting at
the Smith Cove Cruise Terminal. This is the recommended alternative.
FINANCIAL IMPLICATIONS
Cost Estimate
The cost estimate for this work is $185,677. However, with the addition of sales tax, the estimate
becomes $203,316.31.
Source of Funds
The capital costs incurred will be allocated to the work project budget of the existing
CIP 800085. No additional funds are requested.